My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH 520 S HARBOR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
09/02/2008
>
75A - PH 520 S HARBOR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:28:22 PM
Creation date
8/27/2008 11:45:03 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
9/2/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUGUST 11, 2008 <br />PAGE 3 OF 5 <br />13. If lead-based paint is discovered during on-site <br />investigations, all building materials containing lead-based <br />paint will be removed, transported, and disposed of at <br />landfills that meet acceptance criteria for the waste being <br />disposed. Demolition and removal shall be performed in <br />conformance with federal, state, and local laws and <br />regulations pertaining to lead based paint. <br />14. As part of the design for the proposed project, a Water <br />Quality Management Plan (WQMP) will be prepared and <br />implemented. The WQMP will include structural and <br />nonstructural Best Management Practices (BMPs), which will <br />avoid or minimize, to the greatest extent possible, the <br />impacts associated with the daily operation of the project <br />site. <br />15. The proposed project will require a National Pollution <br />Discharge Elimination System (NPDES) permit and will require <br />the preparation of a Stormwater Pollution Prevention Plan <br />(SWPPP) incorporating BMPs to reduce Stormwater impacts during <br />construction. <br />16. Construction activities shall comply with the applicable local <br />jurisdiction's construction noise requirements. The City of <br />Santa Ana Noise Ordinance prohibits construction activities <br />between the hour of 8:00 p.m. and 7:00 a.m. Monday through <br />Saturday, anytime on Sundays, and federal holidays. <br />17. All noise-producing project equipment and vehicles using <br />internal combustion engines shall be equipped with mufflers <br />and air-inlet silencers, where appropriate, in good operating <br />condition that meet or exceed original factory specifications. <br />Mobile or fixed "package" equipment (e.g., arc-welders, air <br />compressors) shall be equipped with shrouds and noise control <br />features that are readily available for that type of <br />equipment. <br />18. All mobile or fixed noise producing equipment used on the <br />project, which is regulated for noise output by a local, <br />state, or federal agency, shall comply with such regulation <br />while in the course of project activity. <br />19. All material stockpiles and mobile equipment staging, parking, <br />and maintenance areas shall be located as far as practicable <br />from noise sensitive receptors. <br />75A-27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.