My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH 520 S HARBOR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
09/02/2008
>
75A - PH 520 S HARBOR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:28:22 PM
Creation date
8/27/2008 11:45:03 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
9/2/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
520 South Harbor Boulevard Harbor Medical and Retail Center Project <br />Initial Study/Mitigated Negative Declaration <br />ZOA 08-02 /CUP 08-23 MND <br />July 31, 2008 <br />ERRATA <br />The following revisions have been made for the Harbor Medical and Retail Center Draft Initial <br />Study/Mitigated Negative Declaration, dated July 2008, as a result of a comment letter received <br />from the Orange County Sanitation District (OCSD) on July 31, 2008 (one day after closing of <br />the 20-day public review period). The revisions affect the below-referenced section of the Initial <br />Study only and do not affect the substance of the analysis included in that document. <br />Furthermore, the below-described revisions do not result in any additional mitigation measures <br />beyond those already included in the Draft Initial Study circulated for public review. Revised <br />text as included in this Errata is denoted by bold text below, whereas deletions are identified by <br />s~l~ text. <br />Page 67, CEQA Checklist Question E. (Utilities and Service Systems): <br />E. Result in a determination by the wastewater treatment provider which serves or may serve <br />the project that it has adequate capacity to serve the project's projected demand in addition to <br />the provider's existing commitments? <br />No Impact. Sewage from the City of Santa Ana is diverted to OCSD's Reclamation Plant <br />Number 1 in Fountain Valley. The plant's primary treatment capacity (including standby) is <br />currently equipped to handle bA 204 million gallons per day (mgd) ~~~~*'~ ~~~r„°a °.,...,,, <br />(OCSD 2008). Furthermore, the secondary treatment <br />capacity is equipped to handle 110 mgd at Plant Number 1 (OCSD 2008). The reclamation <br />plant has enough capacity to handle the increase in project related wastewater, therefore, no <br />further study is required and no mitigation measures are necessary. <br />75A-50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.