Laserfiche WebLink
July 16, 2008 <br />CITY OF SANTA ANA <br />220 S. Daisy Ave., M-85 <br />P.O.-Box 1988 <br />Santa Ana, CA 92702 <br />Attn: Mr. Thom Coughran <br />Water Resources Manager <br />Re: Labor and Equipment Rates <br />Description <br />LABOR RATES <br />Two Man Crew <br />Three Man Crew <br />Four Man Crew <br />Additional Man <br />Additional Operator <br />Two Man Crew (OT) <br />Three Man Crew (OT) <br />Four Man Crew (OT) <br />Additional Man (OT) <br />Additional Operator (OT) <br />EQUIPMENT RATES <br />CAT 446 416, 426, 428, 436 Backhoe <br />Delivery Truck <br />CAT 325 Excavator, or equal <br />Linkbelt RT Crane <br />Kawasaki 80Z, 65Z Loader <br />Vacmaster Pothole Truck <br />Lowbed <br />Lowside End Dump <br />Ten Wheel Dump <br />Bob tail Dump Truck <br />VVater Truck <br />Asphalt Roller <br />Skiploader <br />Concrete Saw <br />8' x 20' Shield (Daily) <br />4' x 20' Shield (Daily) <br />Light Plant (Daily) <br />Arrow Board (Daily) <br />Compaction Wheel (Daily) <br />Addco Message Board (Daily) <br />MATERIAL <br />Material at Cost plus 15% <br />Dump Fees at Cost plus 15% <br />Rates <br />$ 120.00 <br />$ 176.02 <br />'$ 236.35 <br />$ 58.77 <br />$ 64.29 <br />$ 151.53 <br />$ 235.11 <br />$ 303.99 <br />$ 74.98 <br />$ 82.04 <br />$ 127.61 <br />$ 47.38 <br />$ 205.72 <br />$ 192.71 <br />$ 130.21 <br />$ 130.00 <br />$ 130.83 <br />$ 109.01 <br />$ 101.51 <br />$ 86.84 <br />$ 75.90 <br />$ 136.00 <br />$ 98.61 <br />$ 142.10 <br />$ 150.00 <br />$ 125.00 <br />$ 233.94 <br />$ 170.13 <br />$ 248.46 <br />$ 304.34 <br />