My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PAULUS ENGINEERING, INC. 2
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2019
>
PAULUS ENGINEERING, INC. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 4:02:17 PM
Creation date
9/2/2008 11:59:57 AM
Metadata
Fields
Template:
Contracts
Company Name
PAULUS ENGINEERING, INC.
Contract #
A-2008-214
Agency
PUBLIC WORKS
Council Approval Date
8/18/2008
Insurance Exp Date
5/1/2011
Destruction Year
2019
Notes
Amended by A-2008-214-01, A-2013-126
Document Relationships
PAULUS ENGINEERING INC. 2b
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2019
PAULUS ENGINEERING, INC. 2a
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paulus Engineerin1;, Inc. TIME & MATERIAL WORKSHEET TM No. <br />Job No. <br />Customer.' Project: <br />Work Authorized by: Work Date: <br />Descrtotion Foreman: <br />OTY LABOR <br />_1REGHRs1orrHRS1REG RATE <br />I OIT RATE <br />I REG TOTAL <br />I OIT TOTAL <br />Laborer <br />$ 52.00 <br />$ 78.00 <br />$ <br />$ - <br />Pipelayer <br />$ 58.00 <br />$ 8700 <br />$ - <br />$ - <br />Operator <br />$ MOD <br />$ 99" <br />$ - <br />$ - <br />Truck Driver <br />$ 66.00 <br />$ 99.00 <br />$ - <br />$ - <br />Foreman <br />$ 78.00 <br />$ 117.00 <br />$ <br />$ - <br />Superintendent <br />$ 95.00 <br />$ 142.50 <br />S - <br />$ - <br />Subtotal <br />$ <br />Mark Up % <br />15•/6 <br />$ <br />$ - <br />TOTAL $ $ <br />OTY BARE EQUIPMENT <br />AMT. <br />UNIT <br />TOTAL <br />Cat345 Excavator <br />HR <br />$ <br />150.00 <br />$ - <br />Compaction Wheel <br />HR <br />$ <br />35.00 <br />$ <br />Hitachi 4001450 Excavator <br />HR <br />$ <br />150.00 <br />$ - <br />Compaction Wheel <br />HR <br />$ <br />35.00 <br />$ <br />Cat 24W30-Yu1ani 320 Excavator <br />HR <br />$ <br />120.00 <br />$ - <br />Compaction Wheel <br />HR <br />$ <br />35.00 <br />$ - <br />Cat 962 Wheel Loader <br />HR <br />$ <br />115.00 <br />$ <br />Cat 950 Wheel Loader <br />HR <br />$ <br />95.Oo <br />$ <br />Lowbed Tractor/Traller <br />HR <br />$ <br />90.0D <br />$ <br />Cat Backhoe <br />HR <br />$ <br />70.00 <br />$ - <br />CompaclMn Wheel or Breaker <br />HR <br />$ <br />25.00 <br />$ - <br />Boom Truck <br />HR <br />$ <br />38.00 <br />$ <br />10 Wheel bump Truck <br />HR <br />$ <br />52-00 <br />$ <br />6 Wheel Dump Truck <br />HR <br />$ <br />43.OD <br />$ <br />6 Wheel Flat Bed Truck <br />HR <br />$ <br />30.00 <br />$ <br />WaterTruck <br />HR <br />. $ <br />45.00 <br />$ <br />Crew Truck with Tools <br />HR <br />$ <br />38.00 <br />$ <br />Delivery Truck <br />HR <br />$ <br />3D.00 <br />$ - <br />Misc Tools <br />Shoring Jacks - per each <br />Day <br />$ <br />12.00 <br />$ - <br />Trench Plates - per each <br />Day <br />$ <br />12.00 <br />$ <br />Trench Shield <br />Day <br />$ <br />108.00 <br />S <br />Manhole Shield <br />Day <br />$ <br />90.00 <br />$ - <br />X Pump w/Connectors <br />Day <br />$ <br />105.00 <br />$ - <br />Generator <br />Day <br />$ <br />86.00 <br />$ - <br />Air Compressor <br />Day <br />$ <br />125.00 <br />S - <br />Air Blower <br />Day <br />$ <br />65.00 <br />$ - <br />Coirtined Space Equipment <br />Day <br />$ <br />750.00 <br />S - <br />Gas Detection Equipment <br />Day <br />$ <br />65.00 <br />$ <br />Traffk Arrow Board <br />Day <br />$ <br />2DO.00 <br />$ - <br />Traffic Barricades <br />Day <br />$ <br />2.00 <br />$ - <br />Traffic Canes/Delineetors <br />Day <br />$ <br />2.00 <br />$ - <br />Walk Behind Vibratory Plate <br />Day <br />$ <br />80.D0 <br />$ - <br />Misc Small Tools <br />Day <br />$ <br />75.00 <br />$ - <br />Subtotal <br />$ - <br />Mark Up % <br />160% <br />$ - <br />TOTAL $ <br />AMT MATERIAL. SUBCONTRACT, MISC I Unit TOTAL <br />$ <br />Subtotal $ <br />Mark Up % 15% $ <br />TOTAL S. <br />Total Overhead I Profit <br />TOTAL WORKSHEET $ <br />
The URL can be used to link to this page
Your browser does not support the video tag.