DOTS BROS.
<br />Construction Company
<br />COST PLUS RATES
<br />SOUTHERN CALIFORNIA
<br />COST PLUS RATES EFFECTIVE JULY 1, 2008 TO JUNE 30, 2009
<br />Apprentice Rates: Apprentice rates as fisted above are the highest classification prior to journeyman full scab rates. Billing rate forApprenrce will be based on
<br />actual classi cation.
<br />Subsistence: 585.001day
<br />Travel Time: Customer will be advised if travel time is applicable
<br />Overtime Rates: All hours outside regularly constituted shift shall be time and one halt. Sundays and holidays shag be paid at double time. For Operating
<br />Engineers - first four (4) hours outside regular shift, and first twelve (12) hours on Saturday Is time and one her, all additional hours at double time except holidays
<br />which are at triple time. Emergency call out work' - Four (4) hour minimum for tabor and equipment
<br />Markup: Material, subcontractors, subsistence, and outside rentals (including fuel costs), will be billed cost plus sales tax where applicable, plus mark-up of 15%
<br />Boundaries of Southern California Cost Plus Rates: consists of the eleven (11) counties of Las Angeles, Inyo, Mono, Orange, Riverside. San Bernardino,
<br />Imperial, Ventura, Santa Barbara, San Luis Obispo, Kern and in addition: Richardson Rack, Santa Cruz Island, Arch Rode, San Nicholas island, Catarina Island, San
<br />Clemente Island, San Miguel Island, Santa Barbara Island, Santa Rosa Island, Anacapa Island, including ft Channel Islands Monument. Rate Scale does not
<br />include San Diego County.
<br />NOTE: Wage scales are in accordance with Associated General Contractors Master Labor Agreement, and ars subject to change without notice. This
<br />rate sheet is not all inclusive, additional classifications available If required. (v2.0) CA C.L. 273024
<br />11232 E. Firestone Blvd., Norwalk, CA 90650 Phone: (562) 864-6566 Fax: (562) 864-6052 www.dotybros.com CA Lia. 273024
<br />PAY
<br />STRAIGHT OVER
<br />DOUBLE
<br />PAY
<br />STRAIGHT OVER
<br />DOUBLE
<br />CRAFTSMAN/CLASS
<br />CODE
<br />TIME
<br />TIME
<br />TIME
<br />CRAFTSMANrCLASS
<br />CODE
<br />TIME
<br />TIME
<br />TUNE
<br />CARPENTERS
<br />OPERATING ENGINEERS
<br />General Foreman
<br />CGF
<br />85.62
<br />121.78
<br />157.93
<br />General Foreman, Appdx. A
<br />OGF
<br />91.63
<br />126.80
<br />161.97
<br />Operating Foreman
<br />COF
<br />80.32
<br />113.82
<br />147.32
<br />Foreman, Appdx. A
<br />OFM
<br />88.29
<br />121.79
<br />155.29
<br />Foreman
<br />CFM
<br />80.62
<br />11427
<br />147.92
<br />Group 1, Appdx. A- Oiler
<br />OGi
<br />80.13
<br />109.56
<br />138.98
<br />Journeyman
<br />CJIM
<br />75.62
<br />106.77
<br />137.92
<br />Group 2, Appdx. A - Oiler
<br />OG2
<br />81.44
<br />111.51
<br />141.58
<br />Sh ingler
<br />CSJ
<br />75.83
<br />107.09
<br />138.35
<br />Gawp S. Appdx. A - Universal
<br />OG8
<br />84.96
<br />116.79
<br />148.62
<br />Apprentice - 8th Period (90%)
<br />CA8
<br />69.39
<br />97.42
<br />125.46
<br />Group 10, Appdx. A - Mechanic
<br />OGA
<br />85.16
<br />117.09
<br />149.02
<br />Group 8, Appdx. B - Crane < 25 Tons
<br />088
<br />85.44
<br />117.51
<br />149.59
<br />MILLWRIGHTS
<br />Group 9, Appdx. B - Crane > 25 Tons
<br />OB9
<br />85.72
<br />117.94
<br />150.16
<br />General Foreman
<br />CMG
<br />86.46
<br />123.03
<br />159.60
<br />Apprentice, Grp 8. Appdx A - Stop 6 (90%)
<br />OAS
<br />78.59
<br />107.24
<br />135.89
<br />Foreman
<br />CMF
<br />81.45
<br />115.52
<br />149.59
<br />Journeyman
<br />CMJ
<br />76.45
<br />108.02
<br />139.58
<br />Apprentice - 8th Period (95%)
<br />CMB
<br />66.98
<br />93.81
<br />120.64
<br />Uro. PlPF.FlFTERS/WELDERS
<br />INDUSTRIAL.
<br />General Foreman
<br />IGF
<br />94.98
<br />129.68
<br />164.38
<br />CEMENT MASONS
<br />Foreman
<br />IFM
<br />89.09
<br />121.02
<br />152.94
<br />Foreman
<br />MFM
<br />75.86
<br />102.13
<br />128.41
<br />Joumeyman - Welder/Fitter
<br />IJM
<br />8025
<br />108.01
<br />135.78
<br />Journeyman
<br />MdM
<br />72.53
<br />97.13
<br />121.73
<br />Apprentice - Fifth Year
<br />IAS
<br />67.66
<br />92.67
<br />117.65
<br />F&T Machine Operator
<br />MTO
<br />7294
<br />97.76
<br />122.57
<br />Apprentice- 8th 6 Mos. (90%)
<br />MAS
<br />67.61
<br />89.75
<br />111.89
<br />SHORTUNE (LOCAL 250)
<br />Foreman
<br />SFM
<br />93.31
<br />129.90
<br />163.68
<br />LABORERS
<br />Journeyman (Welder/Fitter)
<br />SJM
<br />90.31
<br />125.40
<br />157.75
<br />Operator General Foreman
<br />LOG
<br />88.76
<br />123.93
<br />159.10
<br />Welder Helper
<br />SWH
<br />50.30
<br />68.50
<br />85.65
<br />Operator Foreman
<br />LOF
<br />85.43
<br />118.93
<br />162.43
<br />Pre -Helper
<br />SPH
<br />29.96
<br />41.02
<br />52.08
<br />General Foreman
<br />LGF
<br />71.35
<br />97.81
<br />124.28
<br />Foreman
<br />LFM
<br />69.68
<br />95.31
<br />120.94
<br />Group 1 - General
<br />LGi
<br />62.34
<br />84.30
<br />106.26
<br />Group 2 - Wrapper To 6'
<br />LG2
<br />63.26
<br />85.68
<br />108.10
<br />UTILITY
<br />Group 3- PTO/Wrapper >6'
<br />LG3
<br />64.18
<br />B7.05
<br />109.93
<br />Foreman
<br />UFbt
<br />63.47
<br />89.04
<br />113.29
<br />Group 4 - Pipe layer, CdS
<br />LG4
<br />66.76
<br />90.93
<br />115.10
<br />Welder
<br />UWD
<br />6121
<br />82.85
<br />104.48
<br />Group 5 - Blaster
<br />LG5
<br />67.35
<br />91.81
<br />116.27
<br />JoumeyrnaNFuser
<br />UJMt
<br />52.57'
<br />70.31
<br />88.04
<br />Apprentice - 6th Period (85%)
<br />LA6
<br />51.63
<br />7242
<br />93.22
<br />Pipe Tradesman It
<br />UP2
<br />40.22
<br />51.89
<br />63.57
<br />TEAMSTERS
<br />ELECTRICIANS /INSIDE WIREMEN
<br />Operator General Foreman
<br />TOG
<br />93.86
<br />129.03
<br />164.20
<br />(Rates subject to project location 3 employes bass location)
<br />Operator Foreman
<br />TOF
<br />90.53
<br />124.03
<br />157.53
<br />General Foreman
<br />EGF
<br />97.65
<br />136.91
<br />176.17
<br />General Foreman
<br />TGF
<br />72.63
<br />97.18
<br />121.74
<br />Foreman
<br />EFM
<br />90.42
<br />126.06
<br />161.70
<br />Foreman
<br />TFM
<br />70.96
<br />94.68
<br />118.40
<br />Journeyman
<br />E JMt
<br />83.18
<br />115.20
<br />147.22
<br />Group 2 - 2 Axle
<br />TG2
<br />67.88
<br />90.05
<br />112.23
<br />Apprentice -10th Period (85%)
<br />EAO
<br />72.07
<br />99.29
<br />126.51
<br />Group 3 - 3 Axle
<br />TG3
<br />68.09
<br />90.38
<br />112.66
<br />Group 5 - Working Truck Driver
<br />TG5
<br />68.46
<br />90.93
<br />113.40
<br />PROJECT MANAGEMENT
<br />Group 6 - 4 or More Axle
<br />TG6
<br />68.51
<br />91.00
<br />113.50
<br />Project Manager
<br />MPM
<br />106.33
<br />145.45
<br />187.85
<br />Group 9 - Lo -Bed
<br />TG9
<br />69.68
<br />92.76
<br />115.83
<br />Superintendent
<br />MSP
<br />95.40
<br />130.02
<br />167.93
<br />Group 12 - WTD BoomTrk Cert
<br />TBT
<br />71.73
<br />95.83
<br />119.94
<br />Project Engineer
<br />MPE
<br />74.04
<br />108.37
<br />14270
<br />Apprentice Rates: Apprentice rates as fisted above are the highest classification prior to journeyman full scab rates. Billing rate forApprenrce will be based on
<br />actual classi cation.
<br />Subsistence: 585.001day
<br />Travel Time: Customer will be advised if travel time is applicable
<br />Overtime Rates: All hours outside regularly constituted shift shall be time and one halt. Sundays and holidays shag be paid at double time. For Operating
<br />Engineers - first four (4) hours outside regular shift, and first twelve (12) hours on Saturday Is time and one her, all additional hours at double time except holidays
<br />which are at triple time. Emergency call out work' - Four (4) hour minimum for tabor and equipment
<br />Markup: Material, subcontractors, subsistence, and outside rentals (including fuel costs), will be billed cost plus sales tax where applicable, plus mark-up of 15%
<br />Boundaries of Southern California Cost Plus Rates: consists of the eleven (11) counties of Las Angeles, Inyo, Mono, Orange, Riverside. San Bernardino,
<br />Imperial, Ventura, Santa Barbara, San Luis Obispo, Kern and in addition: Richardson Rack, Santa Cruz Island, Arch Rode, San Nicholas island, Catarina Island, San
<br />Clemente Island, San Miguel Island, Santa Barbara Island, Santa Rosa Island, Anacapa Island, including ft Channel Islands Monument. Rate Scale does not
<br />include San Diego County.
<br />NOTE: Wage scales are in accordance with Associated General Contractors Master Labor Agreement, and ars subject to change without notice. This
<br />rate sheet is not all inclusive, additional classifications available If required. (v2.0) CA C.L. 273024
<br />11232 E. Firestone Blvd., Norwalk, CA 90650 Phone: (562) 864-6566 Fax: (562) 864-6052 www.dotybros.com CA Lia. 273024
<br />
|