My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SULLY-MILLER CONTRACTING COMPANY (BRISTOL ST. IMPROVEMENTS FROM WARNER AVE. TO ST. ANDREW PL.)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
SULLY-MILLER CONTRACTING COMPANY (BRISTOL ST. IMPROVEMENTS FROM WARNER AVE. TO ST. ANDREW PL.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2025 9:55:52 AM
Creation date
4/8/2025 3:59:22 PM
Metadata
Fields
Template:
Contracts
Company Name
SULLY-MILLER CONTRACTING COMPANY (BRISTOL ST. IMPROVEMENTS FROM WARNER AVE. TO ST. ANDREW PL.)
Contract #
P11-6741, 19-6499
Agency
Public Works
Council Approval Date
3/4/2025
Expiration Date
1/1/1900
Insurance Exp Date
4/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> Docusign Envelope ID:91F206F5.424B-431A-B7E6-95AB3921ADA6 <br /> ADDENDUM No. ONE ' <br /> CITY OF SANTA ANA l* Project 11-6741 <br /> PROPOSAL Project 19-6499 <br /> PROJECT NO.: 11-6741 - BRISTOL STREET IMPROVEMENTS FROM WARNER <br /> AVENUE TO SAINT ANDREW PLACE <br /> n <br /> PROJECT NO.: 19-6499 -BRISTOL STREET (PHASE 4) WATER MAIN IMPROVEMENTS <br /> Item Description Qty Unit Unit Price Amount <br /> 81 Install French Drain 94 LF $ $ <br /> 270.00 25,380.00 <br /> 82 Construct Parkway Culvert Type"A"per 20 LF $ $ <br /> City Standard Plan 318 Case 11 600.00 12,000.00 <br /> 83 Construct Parkway Culvert Type"B"per 120 LF $ $ <br /> City Standard Plan 319 Case 11 100.00 12,000.00 <br /> 84 Curb Inlet 30 EA $ $ <br /> 1,200.00 36,000.00 <br /> 85 Retaining Curb 79 LF $ $ <br /> 75.00 5,925.00 <br /> 86 Signing and Striping 1 LS $ $ <br /> 68,500.00 68,500.00 <br /> 87 Landscaping 1 LS $ $ <br /> 445,000.00 445,000.00 <br /> 88 Irrigation 1 LS $ $ <br /> 410,000.00 410,000.00 <br /> 89 24"Box-Coast Live Oak 69 EA $ $ <br /> 775.00 53,475.00 <br /> 90 25'BTH-Date Palm 34 EA $ $ <br /> 4,400.00 149,600.00 <br /> 91 Re-configure Existing Irrigation at 2222 S. I LS $ $ <br /> 6,700.00 6,700.00 <br /> Bristol Street <br /> 92 Re-configure Existing irrigation at 2200 S. 1 LS $ $ <br /> 8,800.00 8,800.00 <br /> Bristol Street <br /> 93 1-Year Landscaping&Irrigation 1 LS $ $ <br /> Maintenance Period 31,000.OD 31,000.00 <br /> 94 Furnish and Install Bus Shelter Unit(12' AD 4 EA $ $ <br /> Sunset Shelter) 37,000.00 148,000.00 <br /> I 95 Bus Island Railing 470 LF $ $ <br /> 291.00 136,770.00 <br /> 96 Filterra Offline(FT0612)- 12'x6'by Contech 5 EA $ $ <br /> or Approved Equal 84,000.00 420,000.00 <br /> 97 Filterra Offline(FT0806)-8'x6'by Contech 2 EA $ $ <br /> or Approved Equal 56,000.00 112,000.00 <br /> 98 Utility Undergrounding 1 LS $ $ <br /> 2,007,000.00 2,007,000.00 <br /> 99 Stormwater Pollution Prevention Plan 1 LS $ $ <br /> (SWPPP)- Risk Level 2 250,000.00 250,000.00 <br /> 100 Project Advertisement Sign 2 EA $ $ <br /> 4,500.00 9,000.00 <br /> P-6 of P-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.