My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SULLY-MILLER CONTRACTING COMPANY (BRISTOL ST. IMPROVEMENTS FROM WARNER AVE. TO ST. ANDREW PL.)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
SULLY-MILLER CONTRACTING COMPANY (BRISTOL ST. IMPROVEMENTS FROM WARNER AVE. TO ST. ANDREW PL.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2026 11:28:14 AM
Creation date
4/8/2025 3:59:22 PM
Metadata
Fields
Template:
Contracts
Company Name
SULLY-MILLER CONTRACTING COMPANY (BRISTOL ST. IMPROVEMENTS FROM WARNER AVE. TO ST. ANDREW PL.)
Contract #
P11-6741, 19-6499
Agency
Public Works
Council Approval Date
3/4/2025
Expiration Date
1/1/1900
Insurance Exp Date
4/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. To compensate the contractor for the additional costs of procurement due to the revised <br /> Tolar Bus Depot furniture. Reference correspondence regarding COR#27 dated October <br /> 14, 2025. <br /> AGREED PRICE = $6,809.55 <br /> 7. To compensate the contractor for the additional work associated with the installation of <br /> scrim fencing provided by others at the project site. Reference correspondence regarding <br /> COR#34 dated January 12, 2026. <br /> AGREED PRICE = $1,502.17 <br /> 8. To compensate the contractor for additional conduits required due to the revised <br /> Charter/Spectrum plans. Reference correspondence regarding COR#31 dated January 23, <br /> 2026. <br /> AGREED PRICE = $293.84 <br /> 9. To compensate the contractor for additional manhole lid adjustment and conduits required <br /> due to the existing TCA/TCG manhole location. Reference correspondence regarding <br /> COR#32 dated January 23, 2026. <br /> AGREED PRICE = $2,810.02 <br /> 10.To compensate the contractor for the additional conduit, trench excavation and backfill, and <br /> mandrel due to the revised AT&T plans. Reference correspondence regarding COR#33 <br /> dated January 23, 2026. <br /> AGREED PRICE = $44,122.09 <br /> EXTRA WORK FOR DISPUTED CLAIMS AT AGREED PRICE <br /> 11.To compensate the contractor for the removal of existing sidewall and footing in order to <br /> install the proposed sound wall. Reference Notice of Claim and Petition for Resolution <br /> under COR #14. <br /> AGREED PRICE = $1,747.39 <br /> 12.To compensate the contractor the additional labor required to excavate subsurface <br /> unknown physical conditions assumed to be Cement Treated Base. Reference Notice <br /> of Claim and Petition for Resolution under COR #16. <br /> AGREED PRICE = $6,227.04 <br /> 13.To compensate the contractor for verification of construction survey staking of the <br /> sound walls location on the West side of Bristol Street. Reference Notice of Claim and <br /> Petition for Resolution under COR #17.1 . <br /> AGREED PRICE =$813.05 <br /> 14.To compensate the contractor for installation of moisture barrier on sound walls where <br /> not indicated on the original plans. Reference Notice of Claim and Petition for <br /> Resolution under COR #18. <br /> AGREED PRICE.= $4,866.42 <br /> 15.To compensate the contractor for engineering fees related to structural certification for <br /> concrete crack chasing procedure. Reference Notice of Claim and Petition for <br /> Resolution under COR#19. <br /> AGREED PRICE = $725.94 <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.