My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for On-Call Demolition Services for Abatement
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/15/2025
>
Item 20 - Agreements for On-Call Demolition Services for Abatement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 4:04:39 PM
Creation date
4/9/2025 3:22:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda
Agency
Planning & Building
Item #
20
Date
4/15/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jrw qF <br />11VTER/OR DEMOLMON, /NC. <br />M&Yi <br />otwotI 10N -AAA rEMEN r•EAR rHWORX <br />L1041603409 - ISIS/249,49'Jz <br />e. Proposed Work Plan <br />Corporate 0f�ce <br />23508 pine Street <br />Newhall, CA 973,27 <br />www-lnteriordemo/itiv� •ne t <br />Interior Demolition, Inc. understands the scope of work and requirements that the City of Santa <br />Ana has provided. IDI will review each project requirement to determine the task order approach <br />in order to successfully complete the work. <br />In a typical residential structure, the demolition consists of the following steps: <br />1.Submmit AQMD Notifications for both Asbestos Abatement and Demolition with a Start and <br />End date accordingly and also notify Cal Osha for the Asbestos related work. <br />2. Create a work schedule <br />3.Obtain required Permits <br />4. Provide submittals such as, creating a plot plan per the city requirements like recycling, <br />erosion control, dust control, soil disturbance, Etc. <br />5. Mobilize and secure the site with fencing or construction canopy <br />6. Start removing asbestos and lead <br />7. Start Demolition <br />8. Schedule for inspection to cap utilities. Cap Utilities <br />9. Rough Grade the area <br />10. Demobilize <br />IDI will make the city aware of any unforeseen situations <br />
The URL can be used to link to this page
Your browser does not support the video tag.