Laserfiche WebLink
Jrw qF <br />11VTER/OR DEMOLMON, /NC. <br />M&Yi <br />otwotI 10N -AAA rEMEN r•EAR rHWORX <br />L1041603409 - ISIS/249,49'Jz <br />e. Proposed Work Plan <br />Corporate 0f�ce <br />23508 pine Street <br />Newhall, CA 973,27 <br />www-lnteriordemo/itiv� •ne t <br />Interior Demolition, Inc. understands the scope of work and requirements that the City of Santa <br />Ana has provided. IDI will review each project requirement to determine the task order approach <br />in order to successfully complete the work. <br />In a typical residential structure, the demolition consists of the following steps: <br />1.Submmit AQMD Notifications for both Asbestos Abatement and Demolition with a Start and <br />End date accordingly and also notify Cal Osha for the Asbestos related work. <br />2. Create a work schedule <br />3.Obtain required Permits <br />4. Provide submittals such as, creating a plot plan per the city requirements like recycling, <br />erosion control, dust control, soil disturbance, Etc. <br />5. Mobilize and secure the site with fencing or construction canopy <br />6. Start removing asbestos and lead <br />7. Start Demolition <br />8. Schedule for inspection to cap utilities. Cap Utilities <br />9. Rough Grade the area <br />10. Demobilize <br />IDI will make the city aware of any unforeseen situations <br />