Laserfiche WebLink
Stephen Stoewer — Senior Project Manager <br />210 South Anaheim Blvd. 10t' Floor, Anaheim, CA 92805 <br />Contact: 714-765-4338 <br />Scope of work: Asbestos/Lead abatement, demolition and clearing and removal of all <br />vegetation. Removal of all utility lines from property and cap. <br />Project total: <br />$236,008.00 <br />Scheduled completion date: 6/24/2019 <br />7, Cedar Hall Bid Package No. 01; Demolition & Hazardous Abatement - Lancaster, CA <br />Owner: Antelope Valley Community College District <br />Alisha Fonder — Project Manager <br />3041 W Ave. K, Lancaster, CA 93536 <br />Contact: 661-510-4560 <br />Scope of work: Asbestos/Lead Abatement and Demolition of Cedar Hall, College <br />buildings. <br />Pro'e� ct total: <br />$716,788.17 <br />Completed: 7/8/2024 <br />8. Demolition - Jordan Downs Areas H2(a), P1 and S7 — Los Angeles, CA <br />Owner: Housing Authority of the City of Los Angeles <br />Kevin Sharp — Senior Project/Construction Manager <br />2600 Wilshire Blvd. Los Angeles, CA 90057 <br />Contact: 213-258-7297 <br />Scope of work: Asbestos/Lead abatement, demolition, fencing and grading of single <br />story and two-story residential buildings at the Housing Authority's Jordan Downs public <br />house community. <br />Proiect total: <br />$2,152,667.00 <br />Completed date. 5/6/2022 <br />