My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for On-Call Demolition Services for Abatement
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/15/2025
>
Item 20 - Agreements for On-Call Demolition Services for Abatement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 4:04:39 PM
Creation date
4/9/2025 3:22:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda
Agency
Planning & Building
Item #
20
Date
4/15/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
qF MF% qF <br />INTERIOR DEMOLITION, INC. <br />m1b m6F mm, <br />"MOL MON -ABA F-l"ENT - EARY'NWORA <br />L/C# do"Op • jBlBJ?4P.FV3.? <br />Corporate 0/i/-eG <br />.26,27 floao/ala Ave,7ae <br />/i9antrase, Cfr' 91020 <br />1*141W-47ttioa We t <br />Asbestos/Lead Work Plan <br />1 14 calendar days prior to beginning any work, a notification for asbestos <br />removal activities was sent to the Air Quality Management District along with all <br />applicable fees. <br />2. Interior Demolition, Inc. will post permits of all equipment on site per AQMD <br />regulations. <br />3. All abatement work areas have been demarcated using warning & danger <br />barrier tape & signs. The demarcated zone is a minimum of 20 feet from the <br />work area. Additionally, warning signs will be placed at all entry and exits to <br />help ensure public safety. <br />4. Interior Demolition, Inc. will utilize a three -stage decontamination unit which <br />will be installed adjacent to the work area. This unit will be equipped with <br />water & towels. Engineering controls such as negative air filtration machines, <br />decontamination chambers & a disposal area will be utilized. <br />5. In order to contain all work areas, 0 mil poly will be erected and any stationary <br />objects that are not being removed will also be covered. <br />5. Interior Demolition, Inc.'s abatement workers will utilize a NIOSH/MSHA <br />approved half face negative pressure respirators. These masks will be <br />equipped with a HEPA filter. Additionally, our workers are required to wear full <br />body coveralls, disposable gloves & safety glasses. <br />7. Interior Demolition, InCs workers will utilize wet methods when removing any <br />ACM or Lead materials. <br />8. Interior Demolition, Inc. has chosen BDC Waste Management's hazardous <br />waste division to handle to the transportation of the waste to their approved <br />landfill. <br />9. Interior Demolition, Inc. will perform the OSHA required air sampling at a <br />minimum of 25% of the work crew on a daily basis. <br />10. IDI will stabilize any lead demarcated by the Survey prior to demolition. <br />
The URL can be used to link to this page
Your browser does not support the video tag.