My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for On-Call Demolition Services for Abatement
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/15/2025
>
Item 20 - Agreements for On-Call Demolition Services for Abatement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 4:04:39 PM
Creation date
4/9/2025 3:22:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda
Agency
Planning & Building
Item #
20
Date
4/15/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
electrical gear, controls etc., will be separated prior to the demolition as much as <br />possible. All metal materials recycled as part of this project will be documented with <br />weight tickets which will be provided to HACLA. These materials will be hauled to the <br />following recycling facilities: <br />Ecology Recycling <br />Santa Fe Springs <br />3.5 CONCRETE AND ASPHALT RECYCLING <br />Clean concrete debris from the demolition activities will be stockpiled and then <br />shipped off for re -cycling. All concrete and asphalt that is hauled off the project site <br />will be recycled and tickets will be provided to LACCD. This type of recycling does not <br />get weighed but each end dump load we haul off is equivalent to 20 tons. The owner <br />will be provided trucking tickets that show the number of loads. <br />As of this writing all concrete material will be shipped to <br />Arcadia Reclamation <br />1270 Arrow Hwy <br />Irwindale, CA <br />3.6 DEMOLITION DEBRIS DISPOSAL <br />All demolition debris that will not be recycled by IDI will be loaded into semi -end <br />dumps and hauled to a disposal facility for further recycling or landfill. The end dumps <br />will be covered prior to leaving the site. 80% by weight of the construction and <br />demolition debris be diverted from landfills by a combination of recycling and re -use. <br />This includes interior soft debris (i.e. drywall, plaster, ceiling tiles, roofing material, <br />etc.). Demolition debris will be hauled to the following disposal facilities: <br />Azusa Land Reclamation <br />1211 W Gladstone St <br />Azusa, CA <br />3.7 SWPPP <br />Interior Demolition, Inc. will maintain all SWPPP requirements. This includes but is not <br />limited to BMP's, shaker plates and straw waddles. <br />4.1 DUST CONTROL <br />IDI will control dust generation with physical barriers (such as perimeter fencing with <br />windscreen) and/or soil wetting. Excavation areas shall be secured and water will be <br />used to control any fugitive dust from blowing onto other properties. The Site will be <br />controlled and no excavation will be conducted in times of high wind conditions (e.g. <br />wind speed in excess of 2S miles per hour). Converse will conduct air monitoring at <br />Site perimeter and work areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.