My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for On-Call Demolition Services for Abatement
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/15/2025
>
Item 20 - Agreements for On-Call Demolition Services for Abatement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 4:04:39 PM
Creation date
4/9/2025 3:22:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda
Agency
Planning & Building
Item #
20
Date
4/15/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J&G's assigned PM will first manage the services that are required to be performed within 24 <br />hours of CTO execution. If required, fencing and boarding will be installed to secure the site. <br />All necessary notices, ordinances, statues of rules, laws and regulations shall be followed in <br />the performance of the CTO. Notifications/permits may include: city grading, city demolition, <br />city sewer capping, Orange County Health Care Agency (OCHCA) tank closure, OCHCA water <br />well closure, OCHCA monitoring well closure, South Coast Air Quality Management District <br />(SCAQMD) demolition, SCAQMD asbestos abatement, SCAQMD VOC containing tank or soil <br />abatement, OSHA excavation, OSHA falsework, OSHA over height, and OShIA scaffolding. <br />The PM will direct J&G's consultant to prepare a Notice of Intent (NOi) to comply with the <br />terms of the general permit to discharge storm water associated with construction activity, for <br />sites that are one acre or larger in size. The PM will submit the NOI and permit fee to the State <br />Water Resources Control Board. When required, the PM will direct J&G's consultant to <br />prepare a Construction Storm Water Pollution Prevention Plan (SWPPP), or an erosion control <br />plan. Storm water best management practices will be implemented as needed for compliance <br />with the SWPPPIErosion Control Plan. Rat and vermin inspections, and bee colony <br />inspections to be performed as necessary. <br />A site specific Health & Safety Plan will be prepared for the project. The FS will conduct weekly <br />tailgate Health & Safety meetings to cover health and safety issues with field workers. J&G's <br />consultant will periodically conduct site safety inspections. Results are given to the PM for <br />directing changes. <br />Underground Service Alert will be contacted to have the location of utilities marked. The PM <br />shall contact utility companies to coordinate any required utility terminations. Where required, <br />sewer capping will occur at the beginning of work. The FS will be on site at the time the agency <br />is scheduled to inspect the utility termination. <br />Care shall be taken to perform the services so as not to endanger the safety or any person or <br />property. At the start of the CTO, the FS will visually survey existing improvements and utilities <br />near the work site, in order to protect them from damage. FS will also visually survey the site <br />for potential materials containing regulated/hazardous wastes. The PM will contact SA of any <br />findings. <br />J&G Industries <br />
The URL can be used to link to this page
Your browser does not support the video tag.