My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BREA CITY OF, PLACENTIA CITY OF, ANAHIEM CITY OF, AND ORANGE CITY OF
Clerk
>
Contracts / Agreements
>
B
>
BREA CITY OF, PLACENTIA CITY OF, ANAHIEM CITY OF, AND ORANGE CITY OF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 3:37:40 PM
Creation date
4/9/2025 3:36:48 PM
Metadata
Fields
Template:
Contracts
Company Name
BREA CITY OF, PLACENTIA CITY OF, ANAHIEM CITY OF, AND ORANGE CITY OF
Contract #
A-2025-032
Agency
Public Works
Council Approval Date
4/1/2025
Expiration Date
12/31/2030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kraemer Boulevard/Glassell Street/Grand Avenue RTSSP <br /> SECTION 3:ACKNOWLEDGEMENT OF REQUIRED TASKS <br /> a. PROJECT TASKS <br /> By checking this box,the Applicant Agency,on behalf of all the participating agencies, agree <br /> to the following tasks: <br /> Primary Implementation (PI) Phase, lasting approximately one year shall include the following: <br /> Task 1: Project Management- PI Phase <br /> This task is ongoing throughout the duration of the PI Phase of the project. It includes day-to-day <br /> project management, such as meetings, progress reports, tracking of schedules, tracking of cost by <br /> agency, invoicing, and overall administration of the PROJECT. <br /> The following list is a minimum of what is required of this task: <br /> • A running record of project cost broken down by Participating Agency shall be part of this task, <br /> This information will be used by the Lead Agency to bill Participating Agencies for their respective <br /> project match, <br /> • A running record of all scope changes and/or any deviations from the final approved application. <br /> This information will be used by the Lead Agency to request for Scope Changes at the Semi-Annual <br /> Review(SAR). <br /> Task 2: Data Collection and Field Review <br /> All agencies on this application will opt out of the Data Collection portion of Task 2 due to participation <br /> in the Countywide Baseline Project. A Before/After study will be completed. However, Data Collection <br /> will be be conducted at the four(4) Caltrans intersections and utilized to develop Signal Timing <br /> Optimization and Implementation. These offorts will be closely coordinated with the Countywide <br /> Baseline Project. Cities of Brea,Anaheim and Orange are committed to excecuting a Cooperative <br /> Agrooement with Caltrans for the Data Collection efforts. Funding for Data Collection at the Caltrans <br /> intersection is included in the respective Agency Task 2. <br /> This task shall include collecting seven-day, 24-hour machine counts, including vehicle and bike <br /> classifications, along each 1-mile segment of the corridor(s). The project shall also produce weekday <br /> and weekend peak period intersection turning movement(ITM)counts at every signalized <br /> intersection, including pedestrian and bicycle counts. 1TM counts shall be conducted for two hours of <br /> each weekday peak period(AM, mid-day, and PM) and a single four-hour Saturday mid-day peak <br /> period. All counts shall be summarized in Microsoft Excel format. All data shall adhere to the CTFP <br /> Guidelines for data compatibility. <br /> Data collection also includes field review of before and after conditions. The floating car method shall <br /> be utilized with software and GPS for the Before'Study to fine-tune the corridor operation and verify <br /> integrity of system intersection clocks. Synchronized Video shall be used to compare actual conditions <br /> to anticipated conditions dictated by the time-space diagram so that any anomalies may be corrected <br /> prior to the 'After'studies task. <br /> Field review conducted as part of this task will document the existing conditions for all signal timing, <br /> infrastructure, and system improvements on the project. This includes pre-construction pictures for <br /> comparison during the post-construction walkthrough, should there be any questions or discrepancies <br /> noted by any parties. Data Collection and Field Review Memos shall be provided to all participating <br /> agencies. <br /> Check this box to indicate all agencies on this application will opt out of the data collection <br /> portion of Task 2 due to participation in the Countywide Baseline Project.A Before/After study <br /> is still required.A memorandum shall be submitted to indicate completion of this task. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.