My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MESA WATER DISTRICT (2)
Clerk
>
Contracts / Agreements
>
M
>
MESA WATER DISTRICT (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 8:55:47 AM
Creation date
4/17/2025 8:55:28 AM
Metadata
Fields
Template:
Contracts
Company Name
MESA WATER DISTRICT
Contract #
A-2025-002
Agency
Public Works
Council Approval Date
1/21/2025
Expiration Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. City will be notified as to the official advertising dates, bid opening date, <br /> construction stark date, and overall construction schedule for the Project. Also, a <br /> representative from City will be invited to attend pre-construction, Project status, and final <br /> walk through meetings. <br /> 8. The Project costs represented in this Agreement are the. contract costs <br /> based upon the Mesa Water contract amount plus Mesa Water's administration costs, <br /> Change orders applicable to such contract must receive the written approval of the <br /> Executive Director of Public Works of Santa Ana or their designee prior to implementation. <br /> Such approval shall not be unreasonably withheld, and., if such approval results in an <br /> adjustment to the contract amount (Project cost), City shall be responsible for its <br /> proportional allocation of the increased costs pursuant to the terms hereof. <br /> 9. The following staff members, or as otherwise designated in writing by either <br /> Party, shall be the designated representatives of each Party to act on each respective <br /> Party's behalf with respect to this Agreement. Any notices, requests, approvals, plan <br /> submittals or communications shall be provided to each representative noted below: <br /> City of Santa Ana; <br /> ATTN: Rudy_Rosas- - - <br /> Deputy Public Works Director/City Engineer <br /> Public Works Agency <br /> Santa Ana, CA 92701 <br /> 20 Civic.Center Plaza, M-21 <br /> Mesa Water District: <br /> ATTN: Andrew D. Wiesner, P.E. <br /> District Engineer <br /> 1965 Placentia Avenue <br /> Costa Mesa, CA, 92627 <br /> 10. Mesa. Water shall cause its contractors for the Project to guarantee the <br /> Project improvements against defects in workmanship and materials for a period of one <br /> (1) year from the date of acceptance. It is further agreed that Mesa Water shall assume <br /> the responsibility for causing the Project improvements to be brought or restored to full <br /> compliance with the requirements of the Plans and Specifications for any portion of the <br /> Project which during said one (1) year period are found not to be in conformance with the <br /> provisions of the Plans and Specifications. <br /> 11, Mesa Water shall have its contractors andfor consultants provide insurance <br /> as set forth in Exhibit C, attached hereto and incorporated herein by this reference. <br /> 12. This Agreement contains all of the agreements of the Parties regarding the <br /> Project and Project costs and all previous understandings, negotiations and agreements <br /> 3 <br /> Cooperative Cost Reimbursement Agreement for croddy Way Street Improvements Project 2025_0227 <br />
The URL can be used to link to this page
Your browser does not support the video tag.