My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. (12)
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 3:06:35 PM
Creation date
4/23/2025 2:58:58 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC.
Contract #
A-2022-070-01
Agency
Public Works
Council Approval Date
5/17/2022
Expiration Date
5/16/2027
Insurance Exp Date
10/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. For all sums which the insured becomes legally <br />obligated to pay as damages caused by <br />"occurrences" under Section I — Coverage A, <br />and for all medical expenses caused by <br />accidents under Section I — Coverage C, which <br />cannot be attributed only to ongoing operations <br />at a single designated construction project <br />shown in the Schedule above: <br />1. Any payments made under Coverage A for <br />damages or under Coverage C for medical <br />expenses shall reduce the amount available <br />under the General Aggregate Limit or the <br />Products -completed Operations Aggregate <br />Limit, whichever is applicable; and <br />2. Such payments shall not reduce any <br />Designated Construction Project General <br />Aggregate Limit. <br />C. When coverage for liability arising out of the <br />"products -completed operations hazard" is <br />provided, any payments for damages because of <br />"bodily injury" or "property damage" included in <br />the "products -completed operations hazard" will <br />reduce the Products -completed Operations <br />Aggregate Limit, and not reduce the General <br />Aggregate Limit nor the Designated Construction <br />Project General Aggregate Limit. <br />D. If the applicable designated construction project <br />has been abandoned, delayed, or abandoned and <br />then restarted, or if the authorized contracting <br />parties deviate from plans, blueprints, designs, <br />specifications or timetables, the project will still be <br />deemed to be the same construction project. <br />E. The provisions of Section III — Limits Of Insurance <br />not otherwise modified by this endorsement shall <br />continue to apply as stipulated. <br />Page 2 of 2 Copyright, Insurance Services Office, Inc., 1996 CG 26 03 05 09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.