ATTACHMENT E <br /> ACCEPTANCE AND TESTING PROCEDURES <br /> Acceptance and Testing Procedures shall include a test plan and schedule covering testing of all major <br /> system features,Testing shall be performed incrementally,where applicable,to discover and address issues <br /> timely. <br /> a. Contractor's quality assurance practices in relation to the proposed solution shall be as follows: <br /> The Contractor Quality Assurance approach aligns to contractor's security framework(governed <br /> by NIST 800-53 controls, FedRAMP, and ISO 27001 compliance) and follows the agile <br /> methodology of testing early and moving in small,measurable increments.Contractor shall have a <br /> set of tests that are run for any given project regardless of the project's content. This allows <br /> contractor to determine with a level of 80-90%confidence that contractor's application is stable <br /> and deployable.Contractor break each project into three basic testing cycles:Initial Regression <br /> Testing IRT,Check Point Regression Testing CPRT and Final Regression Testing FRT.The initial <br /> regression test:is designed to expose as many defects that exist in the Initial Release Candidate. <br /> Working this list down to zero by Code Freeze is the goal of the entire team and this occurs the day <br /> after code complete milestone and is associated with a full end-to-end build of the QA environment <br /> (which also produces the initial deployment plan for Stage and Production).Furthermore,all code <br /> undergoes security review against knower vulnerabilities, and contractor also disable "hazard" <br /> characters use in the system as they are often used for web-based attacks. <br /> b. Acceptance and Testing flan, with schedule, which covers all major system features shall be as <br /> follows: . <br /> Acceptance testing of the Contractor solution is conducted as part of our standard onboarding <br /> process available to all clients. Should County require specific acceptance testing, Contractor is <br /> able to provide such services through our Professional Services team(at an additional fees).As part <br /> of down select, Contractor would welcome the opportunity to discuss custom requirements for <br /> Acceptance Testing and define and deliver an engagement as required. County shall contact <br /> assigned Contractor Account Representative for more information. <br /> Contractor shall Include: <br /> 1, Successful installation and operation of System without any errors. Specifically in the areas of: <br /> • Tiered Administration <br /> • User creation and management <br /> • County-wide data and map import,reconciliation and maintenance processes and routines <br /> ! Citizen opt-in data processes and routines <br /> a Custom and geographic call list generation <br /> • Outbound telephone message launch <br /> • Outbound e-mail message launch <br /> r Use of surveys <br /> • Monitoring of outbound session activity <br /> • Validation of built-in and ad-hoc generated reports <br /> • Accessibility from within the County's network <br /> • Accessibility from the Internet <br /> • IPAWS integration <br /> • Message throughput <br /> Co'in ly of orange r A-0G0--25010178 rile Na 2424402 <br /> Shere-Camirer/Pwrhasing Senlces Bureau Publla Muss Noll6calion Veein Pago 40 of 57 <br /> i <br />