Laserfiche WebLink
wl �t <br /> CITY OF SANTA ANA <br /> c) A completion letter indicating that all asbestos containing materials from these <br /> properties have been abated and properties are ready to be demolished. <br /> C. Lead Removal: <br /> 1) The Contractor shall take all necessary precautions and follow all Occupational Safety& <br /> Health Administration (OSHA')s guidelines required in the handling of lead contained <br /> materials if any are detected. <br /> a) Please refer to the Lead Hazard Evaluation Report which will be provided to the <br /> Contractor prior to on-call bid. <br /> D. Rat and/or Vermin Abatement <br /> 1) Contractor, prior to performing demolition, is responsible for providing rat and/or vermin <br /> abatement. <br /> a) As part of the demolition completion package, written certification will be provided to <br /> the City, stating that such work was performed, and that the structures were free of <br /> infestation prior to the demolition taking place. <br /> E. Erosion Control <br /> 1) Prior to performing work under this Agreement, Contractor shall prepare erosion and <br /> sediment control plan for the approval of the Plan Check Engineer. <br /> a) The plan shall be prepared per the applicable guidelines described in the latest <br /> version of the Orange County Program Construction Runoff Guidance Manual <br /> (httr)://www.ocwatersheds.com/documents/bmr)/constructionactivities). <br /> 2) The Contractor shall submit the plans for review and shall make the necessary revisions <br /> to the plans as directed by the City. <br /> 3) The plans shall be prepared by a Civil Engineer licensed in the State of California, <br /> a) The City may waive the requirement of licensed Civil Engineer if the Contractor can <br /> satisfactorily prove to the City that the person preparing the erosion control plan is <br /> qualified in the field of erosion control. <br /> 4) The Contractor shall keep a copy of the erosion control plan on-site for the duration of <br /> the contract and shall provide all necessary control devices to implement all necessary <br /> measures as shown on the plan. <br /> a) The erosion control plan shall remain in effect until approval to remove is granted by <br /> the City. <br /> 5) All erosion control materials shall be available on-site and stockpiled at a convenient <br /> location to facilitate rapid construction of temporary devices when rain is eminent. <br /> City of Santa Ana RFP No.25-027 Page 22 of 41 <br />