Laserfiche WebLink
shall include; <br /> (a).The address of the property to be demolished. <br /> (b).The anticipated start and etkd dates far the demolition work, , <br /> I <br /> (c).A description of potential iwpacts, such as noise,dust,or road closures, <br /> along with mitfgation measures, <br /> (d).Contact information for the Contractor and the City of Santa Ana Code <br /> .enforcement Division. <br /> E <br /> 3-Day Notlflcstiun. A follow-up written notice shall be issued no less than <br /> three (3) calendar days prior to the commenooment of demolition activities, <br /> This notice shall reiterate the details provided in the 10 Day Notification and <br /> confirm any updates to the schedule or project details. <br /> (3) All notifications pursuant to this Agreement must be delivered through methods <br /> reasonably calculated to ensure tueipt, including direct mail, band delivery, door <br /> hangers,or other congliu-nioation method&agreed and approved,in a sighed writing,by <br /> the Executive Director of the Planning and Building Agency, or their designee, The <br /> Contractor shalt maintain, records of all r)otif"rcations and ,provide oopies to the City <br /> upon request. <br /> (4) rSignage must comply with the following; <br /> L Temporary signage twist be posted if street closure and any public right of way <br /> Will be afhoted. Tomporary signage shall consist of parking signs,directional <br /> signs, or other traffic control signs, and be installed tort(10) days before the <br /> oonunencernent of demolition activities. <br /> ii. All temporary signs rnlrst be reviewed and approved,in a signed writing, by the <br /> Executivo Diroctor of the .Public Works Agency 'or their designer: prior to <br /> posting. Failure to comply with these notifications requirements may result in <br /> termination and any cost recovery to complete the demolition prej out. <br /> COMPENSATION <br /> a. City neithsr warrants nor guarantees any minimum or maximum compensation to Contractor <br /> under this Agreerrrent. Contractor shall be paid only for actual services performed under this j <br /> Agreement at the rates and charges identified in Exhibit B. Contractor is one of four (4) <br /> contractors selected to provide demolition services on an on-call basis render RFP No,25�027. <br /> The total compensation far these services provided by all such contractors selected under RFP <br /> 25-027 shall not excmd the shared aggrogate amount of Six Hundred Thousand Dollars and. r <br /> Zero Carats($600,000)(firing tiro term of the Agreement,including any extension periods. � <br /> , I <br /> a <br /> I <br />