Laserfiche WebLink
<br />'....; <br />1 <br /> <br />IJ <br /> <br />':fE'.).!?, t,""t5 'r: l',1-l'1 t'lWD <br /> <br />rlO.31B P.19 <br /> <br />Agreement No. 4600003098 <br /> <br />EXHIBIT B <br />5T ATEMENT OF WORK - TASKS, TIMEUNES <br />4600003098 <br />The Metropolitan Water Dlstrlct of Southern ea/itom/. <br /> <br />Methodology <br /> <br />The actual aSsessment methodology to be used will be determined during Phases <br />I & II. the methods for monitoring water-saving performance of weather-oased <br />controlfers may Include; <br /> <br />· Data collection and analysis; Customer and controller data will be collected and <br />entered Into a database. <br /> <br />. A sampl. set, representing a cross-section of the types of contrallers instal/ed <br />under this program will be Identitled for monitoring. The following Information wil/ <br />be monitored for. this sample set <br />a. Baseline historical water use Information, if available; <br /> <br />b. Actual water use for duration of this program; and <br />c. Comparative evaluatlon of historical vs. actual water use to estimate water <br />savings, <br /> <br />. Survey Instruments may also be used to determine customer satisfaction with <br />irrigation controllers. <br /> <br />A monitoring and assessment plan will bll delIVered to DWR by the end of month 9. <br /> <br />Project Reportfng <br />Once the appropriate monitoring methodology Is Identffled and developed and project data <br />becomes available, quarterfyprogresa reports to OWR will Include water savings <br />projectIons. Comperlsons between pr. and post-InstallatIon water use, however, wIll be <br />addressed In annual progress reports. <br /> <br />PotentIal database fields may Include fdentfflcal'/on of customer partlclpants, verif1catlon of <br />controller installations, determination of baseline consumption, determination of Irrigation <br />budgets, estimated water savings potential, tracking of water consumptlon and costs for <br />duration of grant program. This database will serve to later evaluate project effectiveness <br />(in terms of costs and w,ater savings). <br /> <br />19 <br /> <br />Rlv/a-.11lli271tl3 <br />