Laserfiche WebLink
City of Santa Ana On -Call Civil Engineering, Architectural & Landscaping Design Services 0 <br />HOURLY RATE SCHEDULE <br />Il►WM. Harris <br />DMJM Harris's proposed hourly rate schedule is as <br />follows: <br />Project Director <br />$204 <br />Project Manager <br />$186 <br />Technical Specialist <br />$171 <br />Principal Engineer <br />$154 <br />Project Controls Manager <br />$137 <br />Senior Engineer <br />$133 <br />Engineer <br />$116 <br />Senior CAD Designer <br />$116 <br />Associate Engineer <br />$97 <br />Project Controls Specialist <br />$91 <br />Assistant Engineer <br />$88 <br />CAD Drafter <br />$78 <br />Administrative Assistant <br />$66 <br />Direct costs <br />Direct costs, including subconsultants, reprographics, <br />plotting, shipping will be billed at actual cost plus 10 <br />percent markup. <br />Supplies <br />Supplies required by the project will be billed at actual <br />cost plus 10 percent markup. <br />Travel <br />Travel expenses will be billed at actual cost plus 10 <br />percent markup. Mileage expenses will be billed at the <br />amount allowed by the IRS, currently at $.505 per mile. <br />Technician <br />$93 <br />Senior Technician <br />$104 <br />Staff Engineer;Geologist/Scientist Field Supervisor <br />$121 <br />Senior Staff Engineer/Geologist/Scientist <br />$138 <br />Operations Manager/Equipment Operator <br />$160 <br />Project Engineer/Geologist/Scientist <br />$160 <br />Senior Project EngineerGeologist/Scientist <br />$176 <br />Associate <br />$198 <br />Principal <br />$215 <br />Senior Principal <br />$259 <br />Administrative AssistantrWord Processor <br />$78 <br />CAD Operator,/Technical Illustrator/GIS Specialist <br />$110 <br />Engineering equipment: <br />Vehicle Usage <br />$120 per hour <br />Tiltmeter, Inclinometer Units <br />$210 per day <br />Nuclear Soil Gauge <br />$88 per day <br />GPS Station <br />$176 per day <br />Other Equipment <br />Upon Request <br />Coast Surveying, Inc.... <br />Project Management $145 <br />Project Surveyor $120 <br />Survey Technician $95 <br />Clerical and Delivery Service $55 <br />2-Person Survey Party w/Equipment $220 <br />3-Person Survey Party w/Equipment $280 <br />GPS Receivers (minimum of three) $100.00.1day/receiver <br />Principal <br />$225 <br />Senior Project Manager <br />$155 <br />Project Manager <br />$125 <br />Senior Landscape Architect <br />$165 <br />Landscape Architect <br />$110 <br />Landscape/Urban Designer <br />$75 <br />GIS Specialist II <br />$100 <br />GIS Specialist 1 <br />$90 <br />Word Processor <br />$85 <br />Note: All rates effective through December 31, 2008, <br />and are subject to a maximum 5% escalation thereafter <br />on a yearly basis. <br />NMZEMSM�� <br />