Laserfiche WebLink
responsible for highway and road safety and the State agency responsible for grade crossing <br />safety. The Notice of Establishment shall include the information shown in Exhibit "C". The <br />public authority shall send the Notice of Establishment to all affected jurisdictions after <br />completion of the construction of improvements at all highway-rail grade crossings and other <br />locations in the proposed quiet zone, including the owner of any private crossing included <br />within the Quiet Zone. <br />2.4 Reimbursements <br />a. Pay for all the cost of environmental or permitting documentation, preliminary and final <br />engineering, construction, maintenance and replacement services of any new equipment or <br />facilities at all highway-rail grade crossings to meet quiet zone requirements. <br />b. Pay in advance an estimated amount of all costs related to review, coordination and flagging <br />to SCRRA for in-house personnel and/or consultants retained by SCRRA. The original <br />estimated costs would not be the upper limit of the costs but provide a guideline for <br />budgeting purposes. Regardless, all costs incurred by SCRRA during design plan review <br />process shall be fully recoverable from the public authority. <br />c. Reimburse SCRRA the actual costs and expenses incurred by SCRRA (less funds previously <br />deposited), including any provisional overhead rates representing SCRRA's costs for <br />administration and management, and its contractors and consultants for all services and work <br />performed in connection with the proposed quiet zones. <br />2.5 Construction <br />a. Proceed with the non-railroad related improvements when SCRRA and CPUC approve the <br />construction of the project. <br />b. Comply with the rules and regulations contained in the current editions of the following <br />SCRRA documents during the construction of the project. The SCRRA agreements and <br />forms are available on SCRRA's website. <br />• Indemnification Agreement (SCRRA Form No. 5) <br />• Temporary Right-of--Entry agreement (SCRRA Form No. 6), <br />• Rules and Requirements for Construction on Raikoad Property (SCRRA Form No. 37), <br />• General Safety Regulations for Construction/Maintenance Activity on Railway Property, <br />and <br />• Applicable SCRRA Engineering Standards. <br />2.6 Maintenance <br />Pay SCRRA the cost of maintenance of any additions, improvements and/or modifications <br />to any active highway-rail grade crossing warning system necessary for the implementation <br />of the proposed quiet zone as per terms and conditions included in the C&M agreement. As <br />an example, if a crossing within a proposed quiet zone requires an upgrade from two gates to four <br />(quad gates), SCRRA will continue to pay the cost of maintenance of the original two gates, and <br />the public authority will reimburse SCRRA for annual maintenance on the additional two gates. <br />The maintenance costs shall include inspections, testing, repairs, replacements, damage, third <br />party utilities, and upgrades. The annual cost of maintenance of the active highway-rail grade <br />crossing warning system shall be as determined by SCRRA, based on its annual survey of the <br />maintenance cost of the system. <br />SCRRA Page 4 4/21/06 <br />25B-36 <br />