My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - QUIET ZONE RAILROAD
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
10/20/2008
>
25B - QUIET ZONE RAILROAD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:27:08 PM
Creation date
10/17/2008 12:17:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25B
Date
10/20/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-8-0862 <br />that each will cooperate and coordinate with the other in all activities covered by this <br />AGREEMENT and any other supplemental agreements. <br />B. The Scope of Work in Exhibit A relating to safety enhancements and quiet zone <br />improvements, are based upon the report titled "OCTA Grade Crossing Study" dated December <br />31, 2003, and as refined during the diagnostic meetings discussed above, as well as <br />subsequent discussions and recommendations by SCRRA, the City, the PUC, and the City's <br />follow-up Final Report dated September 15, 2004, entitled: "Santa Ana Grade Crossing Mobility <br />Study." Enhancements to be included as part of this AGREEMENT are limited to those <br />described in Exhibit A only. <br />ARTICLE 3. RESPONSIBILITY OF THE AUTHORITY <br />AUTHORITY agrees to the following, subject to the requirements of ARTICLE 5 of the <br />AGREEMENT: <br />A. AUTHORITY will enter into and maintain an agreement with SCRRA for design, <br />CPUC crossing modification applications, construction management, material procurement, <br />cost estimates and construction of rail-highway grade crossing enhancements, which include <br />safety related improvements and quiet zone related improvements set forth in Exhibit A. <br />B. Subject to CITY'S 12% matching funds contribution and the work and services <br />described in Article 4 as being the responsibility of the CITY, AUTHORITY will fund the actual <br />cost of all PROJECT improvements including but not limited to, right of way acquisition <br />(including attorney's fees and litigation costs, if any) and utility relocations deemed necessary <br />and appropriate by AUTHORITY and CITY for implimentation of the PROJECT , and excluding <br />CITY costs using funding provided by Commuter Urban Rail Endowment Funds, Renewed <br />Measure M funds. <br />Last Revision 10/16!08 Page 4 of 15 <br />25B-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.