My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
22D - SPEC - WATER BOOSTER PUMP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
11/17/2008
>
22D - SPEC - WATER BOOSTER PUMP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:26:44 PM
Creation date
11/12/2008 9:46:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
22D
Date
11/17/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />NOVEMBER 17, 2008 <br />TITLE: <br />CONTRACT AWARD FOR <br />WATER BOOSTER PUMP SYSTEM <br />(SPEC. NO. 08-061) <br />/,_ <br />;'' <br />~~ ~ <br />CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />^ As Recommended <br />^ As Amended <br />^ Ordinance on is` Reading <br />^ Ordinance on 2"d Reading <br />^ Implementing Resolution <br />^ Set Public Hearing For_ <br />CONTINUED TO <br />FILE NUMBER <br />Award a contract to Murray Company for the installation of a water booster <br />pump system in the amount of $45,389. <br />DISCUSSION <br />City Hall utilizes a water booster pump system to provide water pressure to <br />the building's restrooms, drinking fountains, and kitchens. The existing <br />system is 37 years old and is no longer cost effective to maintain. The <br />contract will provide for the replacement of the existing pump system. <br />The notice inviting bids was advertised on September 10, 2008, and bids <br />were solicited. A summary of the bid invitations and bids received is as <br />follows: <br />6 Invitations For Bid mailed <br />2 Bids received <br />Bids were received and opened on October 6, 2008, and the results are as <br />follows: <br />Vendor: Location: Cost: <br />Murray Company Compton $45,389 <br />Caliagua, Inc. Chino $89,458 <br />The bid received from Murray Company is responsive to the specification and <br />meets the City's requirements. <br />22D-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.