My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25O - RIGHT OF WAY SRVCS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
11/17/2008
>
25O - RIGHT OF WAY SRVCS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:26:54 PM
Creation date
11/12/2008 12:41:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25O
Date
11/17/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CPSI will prepare, maintain and submit correspondence, records, reports, analyses, schedules and databases <br />as required by the City. Project files, including copies of all correspondence, reports, documents, and <br />electronic files, are property of the City. <br />SCOPE OF SERVICES <br />1.0 GENERAL <br />LI GENERAL DESCRIPTION OF SERVICES <br />California Property Specialists, Ina (CPSI) Santa Ana team will provide right of way services in <br />connection with various City of Santa Ana Projects and general real estate related duties as <br />duected by City staff. CPSI professionals will be responsive and maintain excellent working <br />relationship with the public, City staff and other City's consultants. CPSI will provide professional <br />real estate consulting services including project management, oversight, coordination of appraisal, <br />title, Phase I and II ESA's, acquisition services, relocation assistance, property management <br />activities, in-house right of way coordination, and other miscellaneous right of way work. <br />PROJECT COORDINATION AND MANAGEMENT <br />TASK NO. <br />1.2 Meetings <br />Attend meetings with the City and consultants. Meeting minutes, agendas and reports will be <br />provided and distributed as directed by City. <br />1.3 Status Reports <br />Provide and maintain a title, appraisal, acquisition, relocation, and property management Status <br />Reports for all project personnel to access. <br />1.4 Sub Consultant Management <br />Provide management and coordination of services for all consultants. <br />1.5 Monitor and Control Budget Expenditures <br />Prepare, monitor and track project budget expenditures and assist the City with funding <br />reimbursements. <br />1.6 Escrow Coordination <br />Provide coordination services with the Escrow Company, including ordering Preliminary Title <br />Reports, Litigation Guarantees, if required, opening escrows, and facilitating escrows for both <br />acquisition of the subject property and replacement property. <br />1.7 Schedules <br />Prepare and provide to the City project schedules as needed. <br />1.8 QA/QC Management <br />Provide Quality Control Management for all areas of the project, including coordinating efforts <br />with the City to ensure a successful and compliant project. <br />1.9 Project Close Out <br />Provide services required to finalize and close out the project according to City directions. <br />2.0 TITLE AND SERVICES <br />TASK NO. <br />2.1 Preliminary Title Reports <br />Order and monitor completion of Preliminary Title Reports and receipt of supporting documents, <br />Title reports produced for each parcel will at a minimum establish legal owners and all valid liens, <br />250-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.