My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31B - CUP 115 N HARBOR BLVD
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
11/17/2008
>
31B - CUP 115 N HARBOR BLVD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:26:58 PM
Creation date
11/12/2008 1:17:12 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31B
Date
11/17/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Depict the existing 12-inch public sewer main located in the adjacent alley, <br />to be cut and plugged on both sides, prior to entering this site from <br />Figueroa Street and Harbor Boulevard. <br />2. Depict the new location of the new sewer main and note the construction <br />of a new 12-inch public sewer main in the new location as approved by the <br />Water Resources Division as part of the sewer study prepared by the <br />developer. The sewer relocation plan shall include all details for <br />relocations of water mains and storm drain pipelines, if needed. <br />Relocations of all utilities required for the sewer construction shall be at <br />the developer's expense. <br />3. Depict no driveway approaches off First Street. For a safer vehicular <br />maneuverability due to the close proximity to an un-signalized intersection, <br />no curb cuts will be allowed on First Street. <br />4. Depict and note the points of connection of all the public utilities required <br />to service the project site (i.e., sewer, water and storm drain). <br />5. Note a statement of the improvements, dedication and public utilities <br />proposed to be made and installed, plus tabulation showing the total <br />lineal feet and sizes of sewer main, number of water services, lineal feet <br />of curb and gutter, lineal feet of sidewalk and square feet of pavement, <br />etc. <br />6. Incorporate construction of proposed "Site Design" Best Management <br />Practices (BMPs), such as walkways with open joints, sidewalks and <br />parking lot aisles with minimum widths, draining sidewalks into adjacent <br />landscaping, incorporating the landscape area into the drainage system, <br />etc., to minimize the impervious areas and to maximize permeability and <br />natural areas. <br />7. Incorporate construction of any proposed "Treatment Control" BMPs using <br />the Best Available Technology (such as bio-filters, dry or wet detention <br />basins, landscape detentions, wet ponds or wetlands, drainage inserts, <br />filtration basins, etc.) and recommended sizing calculations near the <br />pollutant source, so as to infiltrate and filter the pollutants of concern in <br />post development runoff flow prior to its discharge into any receiving body <br />of water. <br />C. Police Department <br />1. Prior to submittal into building plan check, revise the site plan to shift the <br />trash enclosures south away from the drive through entrance. <br />Resolution No. 2008-32 <br />Page 6 of 8 <br />31 B-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.