My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH 2005 URBAN WATER MGMT PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
11/17/2008
>
75A - PH 2005 URBAN WATER MGMT PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:27:02 PM
Creation date
11/12/2008 1:17:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
11/17/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix C <br />Santa Ana Emergency Operations Plan <br />READ ENTIRE CHECKLIST AT START-UP <br />AND AT BEGINNING OF EACH SHIFT. <br />START - UP ACTION DATE & TIME INITIALS <br />Check in u on arrival at the EOC. <br />Report to the Public Works Branch Coordinator and obtain a <br />briefing. <br />Determine your personal operating location and set up as <br />necessary. <br />Review our osition res onsibilities. <br />Obtain a briefing from the field command post(s) or DOC, if <br />activated, prior to assuming EOC assignment and brief the Public <br />Works Branch Coordinator. <br />Identify yourself as the Water Unit Coordinator by putting on the <br />vest with your title. Print your name on the EOC organization <br />chart next to your assignment. <br />Ensure that all required supplies are available and equipment is <br />working properly (phones, radios, forms, lists, maps, etc.). <br />Clarify any issues regarding your authority and assignment and <br />what others in the or anization do. <br />Activate elements of your Branch/Unit, establish work area, <br />assign duties and ensure Branch/Unit journal/log is opened. <br />Determine 24-hour staffing requirement and request additional <br />support as required. <br />Request additional resources through the Logistics Section or <br />established ordering procedures, as needed. <br />Ensure that all your incoming Branch/Unit personnel are fully <br />briefed. <br />Based on the situation as known or forecast, determine likely <br />future Branch/Unit needs. <br />Think ahead and anticipate situations and problems before they <br />occur. <br />Using activity log, maintain all required records and <br />documentation to support the After-Action Report and the history <br />of the emergency/disaster. Document: <br />• Messages received <br />• Action taken <br />• Decision justification and documentation <br />• Requests filled <br />• EOC personnel, time on duty and assignments <br />Precise information is essential to meet requirements for <br />possible reimbursement by State OES and FEMA. <br />APFRATIANS -- ~Q <br />7~A-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.