My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC-POWERTEC 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
C (INACTIVE)
>
CC-POWERTEC 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:08:58 PM
Creation date
11/17/2008 2:04:57 PM
Metadata
Fields
Template:
Contracts
Company Name
CC-POWERTEC
Contract #
N-2008-146
Agency
PUBLIC WORKS
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />CC-POWERTEC <br />31441 Santa Margarita Parkway, A390 <br />Rancho Santa Margarita, Ca. 92688 <br />(949) 702-2434,(949) 858-8587 Fax <br />REFERENCE: ASSISTANCE ION REPIARATION OR VIARIOUS WATER PROJE ~ g REVIEW, AND <br />As requested, following is our proposal to provide general plan and specifcation review for upcoming <br />water projects in an effort to coordinate citywide water strategy taking into account the completed projects <br />and desired enhancements for new projects. It is recognized that our work on previous projects has <br />conformed to the standards of the City of Santa Ana while providing a complete and comprehensive <br />control strategy. Our effort is in cooperation with your department as part of an overall team effort that <br />provides the City of Santa Ana with excellence in engineering, product selection, and citywide planning in <br />the delivery of water services to its customers. <br />INCLUDED: <br />1 The study twill Ides~ribe how the mod fedxpump s t oinioor wends to well be ope atedtto cover the entse <br />range of pumping operations. <br />2. Assist in the review and preparation of plans and specifications by City staff including outside third- <br />party engineering firm(s). <br />3. Regular meetings with City staff to coordinate and execute a final plan toward bid documents. <br />4. Major components to include Switchgear, MCC's, PLC's, VFD's, Solid-State-Starters, Main Control <br />Panels, power distribution, and field instrumentation requirements. <br />5. Assist in physical layout of equipment to optimize operational control and minimize space <br />requirements. <br />6. These services are provided at the billable rate of: <br />NOT INCLUDED: <br />The City of Santa Ana will compile and provide for review a set of final as-built drawings, equipment <br />submittals, and sequence of operations of respective pump stations. Any blueprint charges to make <br />copies available to us are not included. <br />
The URL can be used to link to this page
Your browser does not support the video tag.