INSURANCE NOi REQUIR€D <br />WORK MAY PROCEED <br />CLERK OF COUNCIL <br />N-2008-156 <br />DATE: 12-2-06 <br />~ ~W AGREEMENT FOR THE PAYMENT OF PUBLIC IMPROVEMENTS <br />~Q;9 Nry9;~ <br />I <br />THIS AGREEMENT, made and entered into this~"Z~~day ofG'~C~ P 2008 by and between the CITY <br />OF SANTA ANA, a municipal corporation of the State of California ("City') and Rancho Santiago <br />Community College District, ("District"). <br />RECITALS: <br />A. The District proposes to construct the Santa Ana College improvements on property located generally <br />at 1530 West 17'h Street in the City of Santa Ana (the "Development"). <br />B. As a condition to the Development, the District is required by the City to install a new public water <br />main in Bristol Street ("Water Main"). The City and the District wish the City to perform the installation <br />of the W ater Main on behalf of the District, at the District's cost. <br />C. As mitigation measures of the Development, the District is required by the City to contribute afair- <br />share portion ("Required Contributions") of the cost of the installation of certain public improvements: <br />(1) A traffic signal at the intersection of Pacific Avenue and Civic Center Drive. <br />(2) A de facto westbound right-turn lane or converting the existing northbound right-turn lane into <br />a shared through/right turn lane at the intersection of Bristol and Civic Center Drive. <br />D. The District, by execution of this Agreement, desires to provide assurances to the City that the <br />Required Contributions and cost of the Water Main will be paid to the City in a timely manner. <br />WHEREFORE, in consideration of the foregoing, the parties hereby agree as follows: <br />City shall complete the design and construction of the Water Main, generally described as <br />approximately 470 lineal feet of 12" PVC water pipe and a 12" gate valve, at District's sole cost and <br />expense. <br />The estimated cost of the Water Main is $106,500, including design engineering, construction, <br />construction administration, and contingencies. The District shall deposit tiie sum of $106,500 to the <br />City within sixty (60) days of this Agreement. <br />If the actual costs of the Water Main are greater than $106,500, District shall pay the City the <br />difference between $106,50D and the actual cost of the Water Main within sixty (60) days of receiving <br />notice of the additional costs from the City. <br />2. The District shall notify the City within thirty (30) days of the student enrollment at Santa Ana College <br />reaches or exceeds 20,750 students or by June 30, 2018 whichever comes first. <br />A. After receiving notification from the District, the City shall prepare an estimated cost, including <br />design engineering, construction, construction administration, and contingencies for both of the <br />following: <br />(1) The total cost of installing a traffic signal at the intersection of Pacific Avenue and Civic <br />Center Drive. <br />(2) A de facto westbound right-turn lane or converting the existing northbound right-turn lane into <br />a shared throughlright turn lane at the intersection of Bristol and Civic Center Drive. <br />