Laserfiche WebLink
3. Install concrete driveway. <br />4. Install chain link fence. <br />5. Install decorative wall and column. <br />6. Remove existing and install new raised Median Island including <br />finish. <br />7. Install decomposed granite. <br />8. Protect existing concrete sidewalk. <br />9. Install new, maintain existing, and remove conflicting traffic <br />control devices including signing, striping, pavement legends <br />and curb painting. <br />D. Railroad Improvements: <br />1. Remove all AC pavements within the railroad right of way. <br />2. Remove grade crossing signal equipment and salvage to <br />SCRRA. <br />3. Remove and salvage railroad grade crossing panels. <br />Replace wood ties with concrete ties. <br />