My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) - 2008
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:33:15 PM
Creation date
12/19/2008 4:30:11 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
Contract #
A-2008-284
Agency
Public Works
Council Approval Date
10/20/2008
Expiration Date
12/31/2010
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Install concrete driveway. <br />4. Install chain link fence. <br />5. Install decorative wall and column. <br />6. Remove existing and install new raised Median Island including <br />finish. <br />7. Install decomposed granite. <br />8. Protect existing concrete sidewalk. <br />9. Install new, maintain existing, and remove conflicting traffic <br />control devices including signing, striping, pavement legends <br />and curb painting. <br />D. Railroad Improvements: <br />1. Remove all AC pavements within the railroad right of way. <br />2. Remove grade crossing signal equipment and salvage to <br />SCRRA. <br />3. Remove and salvage railroad grade crossing panels. <br />Replace wood ties with concrete ties. <br />
The URL can be used to link to this page
Your browser does not support the video tag.