My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALBUS-KEEFE & ASSOCIATES - 2008
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
A (INACTIVE)
>
ALBUS-KEEFE & ASSOCIATES - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 3:15:19 PM
Creation date
12/29/2008 9:42:13 AM
Metadata
Fields
Template:
Contracts
Company Name
ALBUS-KEEFE & ASSOCIATES
Contract #
A-2008-102
Agency
PLANNING & BUILDING
Council Approval Date
6/2/2008
Expiration Date
6/30/2009
Insurance Exp Date
9/1/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Co <br />rate Pro <br />QUALITYASSURANCE <br />Quality assurance is essential to maintain the high standards demanded by our clients and Albus- <br />Keefe & Associates, Inc. Our comprehensive quality assurance program during the design and <br />construction phases insures the project will be dependable, cost effective, and adhere to the design <br />specifications, industry standards, and regulatory codes. The following is a brief summary of key <br />elements of our quality assurance program: <br />• Selective hiring of qualified personnel <br />• Continuing education and training programs for management as well as staff <br />• Careful coordination with other project consultants and the client for project needs <br />• Systematic calibration of lab and field testing equipment <br />• Pre - construction meeting with site contractors to discuss the construction plan <br />• Field mapping of exposed geologic structure and removals during construction <br />• Compaction testing of fill soils during all phases of grading and backfill <br />• Observation of foundation excavations, drainage devices, and materials placement <br />Installation and observation of field instrumentation to monitor performance <br />• Thorough documentation of observations throughout the duration of the project <br />• Review and update project schedules, budgets, and scope of services <br />Comprehensive technical review by the principals of the firm throughout project <br />ALB US -KEEFE & ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.