Laserfiche WebLink
ALB US -KEEFE & ASSOCIATES, INC. <br />GEOTECHNICALCONSULTANTS <br />SCHEDULE OF FEES <br />Effective January 1, 2008 <br />HOURLY CHARGES FOR PERSONNEL <br />Portal -to -portal charges for professional and technical staff will accrue in accordance with the following schedule of <br />hourly rates: <br />1. Overtime for field technical personnel will be charged at 1.5 times the hourly rate for hours worked over 8.0 hours <br />per day and/or Saturdays and Sundays. <br />OTHER EXPENSES <br />Automobile and truck expenses for company personnel are included in the hourly rate. <br />Travel and subsistence expenses (transportation, room and board, etc.) for individuals on projects more than 60 miles <br />away from their principal office are charged at cost. <br />Exploratory equipment rentals (drill rigs, backhoes, dozers, etc.) are charged at cost plus 20 percent. <br />Monitoring instrument charges will be quoted on an as- needed basis. <br />Direct project expenses (i.e., printing, photography, aerial photos, permits, etc.) are charged at cost plus 20 percent. <br />1011 NArmando St •Anaheim • CA • 92806 -2606 (714) 630 -1626 • FAX (714) 630 -1916 <br />Hourly Rate <br />Personnel Classification <br />$160.00 <br />Principal Engineer/ Geologist ................................. ............................... <br />$120.00 <br />Associate Engineer /Geologist ................................................... <br />............................... <br />$105.00 <br />Project Engineer/ Geologist ...................................................... <br />............................... <br />$95.00 <br />Staff Engineer / Geologist ................................................. <br />............................... ....... <br />. $83.00 <br />FieldSupervisor ...................................................... ............................................ <br />$72.00 <br />Senior Soil Technician (i) .........................:.............................. <br />........I....................." <br />$60.00 <br />Soil Technician (p ............... ........................... ............................... <br />....................... <br />$72.00 <br />Laboratory Technician ........................................................... <br />............................... <br />$66.00 <br />Technical Illustrator .............................................................. <br />............................... <br />$40.00 <br />Word Processing / Clerical ......................................................... <br />............................... <br />1. Overtime for field technical personnel will be charged at 1.5 times the hourly rate for hours worked over 8.0 hours <br />per day and/or Saturdays and Sundays. <br />OTHER EXPENSES <br />Automobile and truck expenses for company personnel are included in the hourly rate. <br />Travel and subsistence expenses (transportation, room and board, etc.) for individuals on projects more than 60 miles <br />away from their principal office are charged at cost. <br />Exploratory equipment rentals (drill rigs, backhoes, dozers, etc.) are charged at cost plus 20 percent. <br />Monitoring instrument charges will be quoted on an as- needed basis. <br />Direct project expenses (i.e., printing, photography, aerial photos, permits, etc.) are charged at cost plus 20 percent. <br />1011 NArmando St •Anaheim • CA • 92806 -2606 (714) 630 -1626 • FAX (714) 630 -1916 <br />