My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2009-01-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
01/05/2009
>
FULL PACKET_2009-01-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:24:56 PM
Creation date
12/31/2008 11:00:40 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
1/5/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Neighborhood Water Main <br />Improvements <br />January 5, 2009 <br />Page 2 <br />Bids received: 22 <br />Bids received from Santa Ana Contractors: 2 <br />NAME OF BIDDER CITY BID AMOUNT <br />1. J. Desigio Construction, Inc. Arcadia $323,050.00 <br />2. MNR Construction, Inc. San Dimas $358,100.00 <br />3. Dominguez General Engineering Rosemead $364,650.00 <br />4. Miramontes Company, Inc. Santa Ana $366,300.00 <br />5. Atlas Allied, Inc. Anaheim $375,100.00 <br />6. J. A. Salazar La Habra $377,050.00 <br />7. BNB Engineering Santa Ana $380,580.00 <br />8. General Underground Fire Protection Anaheim $380,774.50 <br />9. C. P. Construction, Inc. Ontario $394,050.00 <br />10. Stephen Doreck Equipment Long Beach $418,528.00 <br />11. Majich Brothers Altadena $444,750.00 <br />12. Gentry Brothers, Inc. Irwindale $448,750.00 <br />13. B. R. Day Construction, Inc. Covina $457,545.00 <br />14. Garcia Juarez Construction Brea $459,800.00 <br />15. Engineering Pipeline Baldwin Park $471,200.00 <br />16. West Valley Construction San Jose $482,485.00 <br />17. Tomovich & Associates Pico Rivera <br />$522,700.00 <br />18. Paulus Engineering, Inc. Anaheim $547,130.00 <br />19. Cedro Construction Santa Paula <br />$592,241.00 <br />20. Savala Construction Co. Irvine <br />$651,216.36 <br />21. So. Cal. Pipeline Construction Tustin $682,200.00 <br />A total of 22 bids were received and all but one were responsive. Two <br />days after the bid opening, Sandoval & Johnson Construction requested to <br />be relieved of their bid, stating that they had made a clerical error in <br />filling out the bid. After examining Sandoval & Johnson Construction's <br />bid and other documents, staff has found sufficient grounds for the <br />relief of their bid, and therefore recommends that Sandoval & Johnson <br />Construction's request be granted. The lowest responsive bid was <br />submitted by J. Desigio Construction for $323,050, which is below the <br />Engineer's estimate of $400,000. <br />$NVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the <br />recommended action is exempt from further review. Categorical <br />Exemption, ER #2008-97 has been filed. <br />23D-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.