My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2009-01-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
01/05/2009
>
FULL PACKET_2009-01-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:24:56 PM
Creation date
12/31/2008 11:00:40 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
1/5/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />JANUARY 5, 2009 <br />1 <br />~~ <br />TITLE: <br />REJECTION OF BIDS FOR WEST <br />PUMP STATION FACILITIES <br />UPGRADE (PROJECT NO. 05-3195) <br /> <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />^ As Recommended <br />^ As Amended <br />^ Ordinance on 1S` Reading <br />^ Ordinance on 2"d Reading <br />^ Implementing Resolution <br />^ Set Public Hearing For_ <br />CONTINUED TO <br />FILE NUMBER <br />Reject all bids for the West Pump Station Facilities Upgrade. <br />DISCUSSION <br />Santa Ana's west reservoir and pumping station was constructed in 1963 <br />(Exhibit 1) The facility includes a six million gallon steel water <br />reservoir with five electric motor driven booster pumps used to supply <br />potable water to the City's distribution system. All equipment and <br />piping is currently located outdoors within a secured site. The pumping <br />equipment is worn and deteriorated from years of operation and exposure <br />to the elements; the electrical panels and wiring are obsolete and <br />operate inefficiently; and the site paving is badly deteriorated. The <br />project provides for replacement of the pumping and electrical <br />equipment, construction of a pump station building and reconstruction of <br />the site pavement. <br />The Notice Inviting Bids was advertised on October 29 and 31, 2008, and <br />bids were opened on December 8, 2008. A summary of the bid invitations <br />mailed, the bids received, and the bid results follows. <br />Santa Ana Contractors receiving notices: 9 <br />Contractors requesting bidding documents: 52 <br />Bids received: 15 <br />Bids received from Santa Ana Contractors: 0 <br />23G-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.