My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75E - 2909 S BRISTOL
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
02/02/2009
>
75E - 2909 S BRISTOL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:24:38 PM
Creation date
1/28/2009 1:49:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75E
Date
2/2/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"~;' ', Environmental Checklist <br />- CEQA Compliance <br />Environmental Factors Potentially Affected: <br />The environmental factors checked below would be potentially affected by that project, involving at least one impact <br />that is a "Potentially Significant Impact" as indicated by the checklist on the following pages. <br />O Aesthetics 0 Mineral Resources <br />O Agricultural Resources <br />O Air Quality <br />O Biological Resources <br />O Cultural Resources <br />O Geology and Soils <br />O Hazards and hazardous Materials <br />0 Hydrology and Water Quality <br />O Land Use and Planning <br />O Noise <br />0 Population and Housing <br />O Public Services <br />O Recreation <br />O Transportation and Traffic <br />O Utilities and Service Systems <br />O Mandatory Findings of Significance <br />Environmental Determination <br />On the basis of this initial evaluation, I find that: <br />A. ^ The proposed project COULD NOT have a significant effect on the environment and a NEGATIVE <br />DECLARATION will be prepared. <br />B. 0 Although the proposed project could have a significant effect on the environment, there will not be a <br />significant effect in this case because revisions to the project have been made by or agreed to by the <br />applicant. A MITIGATED NEGATIVE DECLARATION will be prepared. <br />C. ^ The proposed project MAY have a significant effect on the environment and an ENVIRONMENTAL <br />IMPACT REPORT is required. <br />D. ^ Although the proposed project could have a significant effect on the environment, because all potentially <br />significant effects (a) have been analyzed adequately in an earlier EIR (EIR No. -)pursuant to applicable <br />standards and (b) have been avoided or mitigated pursuant to that earlier EIR, including revisions or <br />mitigation measures that are imposed upon the project, nothing further is required. <br />E. ^ Pursuant to Section 15164 of the CEQA Guidelines, an EIR (EIR No. -)has been prepared earlier and <br />only minor technical changes or additions are necessary to make the previous EIR adequate and these <br />changes do not raise important new issues about the significant effects on the environment. An <br />ADDENDUM to the EIR shall be prepared. <br />F. ^ Pursuant to Section 15162 of the CEQA Guidelines, an EIR (EIR No. -)has been prepared zarlier; <br />however, subsequent proposed changes in the project and/or new information of substantial importance <br />will cause one or more significant effects no previously discussed. A SUBSEQUENT EIR shall be <br />prepared. <br />Page 74 of 64 <br />75E-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.