Laserfiche WebLink
... <br />MAYOR <br />lld <br />Mi <br />l A P •~,~ <br />'~~'" CITY MANAGER <br />David N Ream <br />o <br />gue <br />u ~'~ "`r <br />MAYOR PRO TEt~4 <br />Claudia C. Alvarez CITY ATTORNEY <br />Joseph W Fletcher <br />GOUNCILMEMBERS ~ <br />S2'f „~ CLERK OF THE COUNCVL <br />P. David Benavides Patricia E Healy <br />Carlos Bustamante <br />Michele Martinez <br />Vincent F Sarmiento CITY OF SANTA ANA <br />Sal Tinajero <br /> PUBLIC WORKS AGENCY M-85 <br /> 220 S. Daisy Avenue, M85 - P O. Box 1988 <br /> Santa Ana. California 92702 <br />NOTICE OF INTENT <br />TO ADOPT A MITIGATED NEGATIVE DECLARATION <br />This is to inform the general public that the City of Santa Ana proposes to adopt a Mitigated Negative Declaration <br />for the following project: <br />Project Title: San Lorenzo Lift Station <br />Project Description: The City of Santa Ana is proposing to construct a new sewer lift station, to be located at <br />the end of San Lorenzo Avenue just east of Bristol Street. The proposed sewer lift station would replace an <br />existing lift station located beneath Bristol Street approximately 700 feet to the west of the proposed new lift <br />station. The new lift station is proposed to update the equipment and to provide additional redundancies in order <br />to reduce the chance for a sewer spill. The new lift station would not increase the capacity of the existing sewer <br />system in the vicinity. During construction of the proposed. project atemporary construction easement is proposed <br />to the west and north of the proposed facility and would comprise an approximate 900 s.f. area to facilitate the <br />removal of an existing block wall and to allow for site improvements. Features proposed as part of the project <br />include: a wet well of sufficient size and depth to prevent back up and surcharging of the upstream sewer mains; <br />a below ground dry pit to house the pumps, motors, associated equipment and appurtenances; a small above- <br />ground block building (approximately 8 feet by 30 feet in size) to house the electrical panels; a stairway access <br />into the dry pit; and new landscape and hardscape improvements around the building for that area within the <br />public right-of-way (sidewalk, curb and gutter, street trees, shrubs, and ground cover). As part of the proposed <br />project, the City of Santa Ana would be required to acquire approximately 292 s.f. of area located along the <br />northwestern portion of the site. The area proposed for acquisition would overlap with a portion of the proposed <br />temporary construction easement. The project also proposes the construction of 1,300 lineal feet of new 15-inch <br />to 18-inch sewer main and appurtenances to connect several existing sewer mains to the new lift station. <br />Project Location: Bristol Street, Segerstrom Avenue, and San Lorenzo Avenue in the City of Santa Ana. <br />Project Number: Public Works Agency Project No. 06-3510 <br />Public Review Period: December 23, 2008 to January 12, 2009 <br />Hearing Date: Not applicable. The proposed project would require only administrative approval from the <br />City of Santa Ana, and no public hearing is required. <br />Hearing Location: Not Applicable <br />The Mitigated Negative Declaration and Initial Study as well as all referenced documents will be available for <br />public review at the City of Santa Ana Public Works Agency, located at 220 South Daisy Avenue, Santa Ana, <br />California. Please submit any comments on the Mitigated Negative Declaration to the City on or before January <br />12, 2009. Please direct your comments to: Mr. Steve Worrall, Senior Civil Engineer, City of Santa Ana, P.O. Box <br />1988, M-85, Santa Ana, CA 92702. <br />If you have any questions or would like any additional information, please contact Steve Worrall at (714) 647- <br />3319. <br />Page 1 of 64 <br />75E-5 <br />