My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - 301 EAST JEANETTE LANE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
03/02/2009
>
75A - 301 EAST JEANETTE LANE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:23:09 PM
Creation date
2/24/2009 2:29:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
3/2/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. Phasing of landscape implementation shall be compatible with the <br />construction schedule for the entire project, as per the approved <br />site plan. <br />11. All fountains and water features throughout the project shall be <br />plumbed for non-potable "gray water" for conversion when such <br />water is available. <br />12. A xeriphytic landscaping materials and irrigation design shall be <br />used for this project. In addition, the plant palette along the <br />southerly edge of the project shall be compatible with that of <br />Santiago Park, where the park is adjacent to the project. <br />75~~ 66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.