My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - WEB-SITE AND PROMO COMMUNICATIONS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
03/02/2009
>
25E - AGMT - WEB-SITE AND PROMO COMMUNICATIONS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:22:58 PM
Creation date
2/24/2009 3:29:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25E
Date
3/2/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana shall: <br />a. Analyze with Westbound project personnel the identified requirements and make such <br />implementation decisions as are reasonably required to finalize the Project Schedule. <br />b. Review the final Project Schedule and identify in writing any specific deficiencies found <br />within twenty (20) business days. <br />Completion Criteria: <br />This task is considered complete upon the resolution of deficiencies found during the twenty-day <br />Project Schedule review, and upon mutual agreement of the finalized project schedule. <br />Task 1-C: Design Documentation <br />Objective: Establish design documentation for ReadyOC website. . <br />Task Description: <br />Westbound shall provide subject matter experts to articulate and document the design of the <br />proposed upgraded ReadyOC website: <br />Site Information and Content Map <br />a. Details all pages, sections and content positions; <br />1. includes two rounds of client input. <br />b. Site Sketches <br />1. Includes one design iteration with two rounds of client input/alterations <br />Westbound shall: <br />a. Review with Santa Ana personnel the design documentation and make appropriate <br />alterations, as needed. <br />b. Provide Santa Ana with a Site Information and Content Map document. <br />c. Provide site sketches and design document. <br />d. Outline a Site Shell. <br />Santa Ana shall: <br />a. Ensure Stakeholders are made available to Westbound for all aspects of the design <br />25E-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.