My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - CUP 2008-37 AT 2130 N GRAND AVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
03/02/2009
>
31A - CUP 2008-37 AT 2130 N GRAND AVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:22:59 PM
Creation date
2/24/2009 3:29:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
3/2/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditional Use Permit No. 2008-37 <br />January 26, 2009 <br />Page 2 <br />through twelfth grade. A total of 153 students are anticipated to occupy <br />eight classrooms within the proposed buildings. The school and childcare <br />facility will operate Monday through Friday from 7:30 a.m. until 4:30p.m. <br />Additionally, night classes will be offered on Wednesdays and Fridays from <br />7:30 p.m. to 10:00 p.m. (Exhibit 3). <br />A total of 10,414 square feet will be utilized for the school use. <br />Approximately 4,692 square feet will be devoted to the eight classrooms, <br />with 3,393 square feet to be used for the school offices, storage and <br />common spaces. Based on these space requirements, the school will exceed <br />the City's parking requirement for private schools. A total of 22 parking <br />stalls are required for the school facility (1.5 spaces per classroom and <br />1 space for 333 square feet of office area), with 268 spaces provided <br />(Exhibits 4, 5 and 6). <br />The project is proposed to be constructed in two phases. The first <br />phase will consist of the reconfiguration of the existing parking lot <br />and the construction of the gymnasium building. The parking lot <br />reconfiguration will involve the repaving, restriping and installation <br />of parking lot landscaping and lighting. The second phase of the <br />project will involve the construction of the two-story classroom <br />building adjacent to the gymnasium. Both of the proposed structures <br />will utilize similar architectural features and materials such as <br />natural flagstone and perforated metal paneling in order to highlight <br />the features of the existing buildings on the new structures (Exhibits <br />7 , 8 and 9 ) . <br />Analysis of the Issues <br />In 1960, Conditional Use Permit No. 12 was approved to allow the <br />construction of the Northside Church of Christ Church at the subject site. <br />In 1977, Conditional Use Permit No. 77-10 was approved to allow a pre- <br />school in conjunction with the existing church facility. The church is <br />now requesting approval of a conditional use permit to expand the school <br />use to include children from kindergarten to twelfth grade as well as <br />construct approximately 21,000 square feet of additional classroom and <br />gymnasium facilities. <br />As proposed, this project meets the City's parking and landscaping <br />requirements and complies with the provisions of Chapter 41 of the Santa <br />Ana Municipal Code. The additional classroom buildings in conjunction <br />with the church result in a total off-street parking requirement of 253 <br />parking spaces while 268 parking spaces are proposed. Access to the site <br />31 A-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.