Laserfiche WebLink
<br /> b <br /> b <br /> b <br />::u b <br /><I> b <br />'" <br />0 <br />~ b <br />0 b <br />::J <br />"Z b <br />c210 b <br /><1>1\) <br />wo b <br />.....0 <br />o'f' b <br />-0 <br />w~ <br />0>0> <br /> <br />USER FEE STUDY SUMMARY SHEET <br /> <br />- PER UNIT INFORMATION- <br /> <br />City of Santa Ana <br />Engineering - Development <br />FY 2007/08 <br /> <br /> Recommendations <br /> S8lVice Name Service Annual Cunent Fee % of FIJI Cost l00%ofFtJl Currem Cost Recovery Fee@ Poley Subsidy @ Policy <br /> Type Volume Cost Subsidy Poicy level (%) level Level <br />1 T ralSoortabon Permit - Annual State 215 $90.00 1'3.85% $79.05 -$10.95 100.00% $90.00 -$10.95 <br />2 Tnrlsportation Permit. Sinale Trip State 215 $16.00 20.24% $79.05 $63.05 100.00% $16.00 $63.05 <br />3 Transportation Permit - Fax Processing State 6 $31.00 39.21% $79.05 $48.05 100.00% $31.00 $48.05 <br />4 Building MCNing Pennit Each 0 $91.46 nla nla nla delete delete delete <br />5 Bu~ding Moving - U1der 1,000 SQ ft Each 0 $99.07 nla nla nla delete delete delete <br />6 BuUdinnMOYM 1.000saft+ Eactl 0 $121.94 nla nla nla delete delete delete <br />9 Accelerated Plan Check Hourtv 10 $14724 69.85% $210.81 $63.57 100.00% $211.00 $0 <br />10 Improvement Plan Check Hourty 91 $133.85 84.66% $158.10 $24.25 100.00% $158.00 $0 <br />" Surface Drainage Plan Check Hourty 91 $129.56 81.95% $158.10 $28.54 100.00% $158.00 $0 <br />12 Tract Map - Final Hourty 32 $133.86 84.67% $158.10 $24.24 100.00% $158.00 $0 <br />13 Parcel Ma:I - Final Hourlv 32 $133.86 84.67% $158.10 $24.24 100.00% $158.00 $0 <br />14 llA I Lot Meroer I Cert of Comoliaoce Hourlv 32 $13386 8467% $158.10 $24.24 100.00% $158.00 $0 <br />15 Si~le Family Resd. Repair Insp. Each 46 $73.61 31.40% $234.40 $160.79 100.00% $234.00 $0 <br />16 Street WorK Permit/Inspection Each 46 $135.65 5t.19% $264.98 $129.33 100.00% $265.00 $0 <br />17 Trench Insp: Paving (600 sq ft) Sq Fool 46 $564.00 54.91% $1.027.09 $463.09 100.00% $1,027.00 $0 <br />18 StOrmlSewerlWater lnsos Pavinq (200 so ftl So Foot 46 $868.00 52.49% $1.653.69 $785.69 100.00% $1.654.00 $0 <br />19 Sewer Laterals/Water Svcs InsD Each 46 $264.71 30.49% $868.32 $603.61 100.00% $868.00 $0 <br />20 Manhole, Vauls, CatchbaSIls etc. Insp Each 46 $199.00 19.38% $1.027.09 $828.09 100.00% $1.027.00 $0 <br />21 Curb, Gutter, inclde earthWOr1\ (200 sq ft) Sq Foot 46 $322.00 82.16% $391.91 $69.91 100.00% $392.00 $0 <br />22 Curb Return, inclde eartl'w.tork Each 46 $63.95 24.21% $264.17 $200.22 100.00% $264.00 $0 <br />23 Sidewalk. irx:ludina earthwork (4' x 30') Sq Foot 46 $69.60 44.80% $155.34 $85.74 100.00% $155.00 $0 <br />24 Drive Amroach, incld earthwork (25' x 8') So Foot 46 $148.00 84.22% $175.73 $27.73 10000% $176.00 $0 <br />25 Pavina: 2.000 5<l ft So Foot 46 $460.00 63.72% $721.92 $261.92 100.00% $722.00 $0 <br /> <br /># <br /> <br />a <br /> <br />a <br /> <br />a <br /> <br /><:r <br />,.. <br />~ <br />~ <br />'" <br />