Laserfiche WebLink
Conditions for Approval for Conditional Use Permit No. 2009-01 <br />Conditional Use Permit No. 2009-01 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with all applicable sections of the Santa Ana <br />Municipal Code, the California Administrative Code, the California Building Standards <br />Code and all other applicable regulations. <br />The applicant must comply in full with each and every condition listed below rig or to <br />exercising the rights conferred by this conditional use permit. <br />The applicant must remain in compliance with all conditions listed below throughout the <br />life of the conditional use permit. Failure to comply with each and every condition may <br />result in the revocation of the conditional use permit. <br />A. Planning Division <br />1. The applicant must comply with all conditions and requirements of the <br />Development Review Committee for the development project (DP No. 08- <br />73). <br />2. Any amendment to this conditional use permit must be submitted to the <br />Planning Division for review. At that time, staff will determine if <br />administrative relief is available or the conditional use permit must be <br />amended. <br />3. The proposed monopine shall be constructed as per approved plans and <br />the existing landscaping shall be protected in place during the construction <br />period for the 60-foot monopine facility. <br />4. The permit applicant recognizes that the frequencies used by the cellular <br />facility located at 2929 South Halladay Street are extremely close to the <br />frequencies used by the City of Santa Ana for Public Safety. This <br />proximity will require extraordinary "comprehensive advanced planning <br />and frequency coordination" engineering measures to prevent <br />interference, especially in the choice of frequencies and radio ancillary <br />hardware. This is encouraged in the "Best Practices Guide" published by <br />the Association of Public-Safety Communications Officials-International, <br />Incorporated (APCO), and as endorsed by the Federal Communications <br />Commission (FCC). Prior to the issuance of any permits to install the <br />facility, (Permit Applicant) shall meet in good faith to coordinate the use of <br />frequencies and equipment with the Communications Division of the <br />Orange County Sheriff-Coroner Department to minimize, to the greatest <br />extent possible, any interference with the Public Safety 800 MHz <br />Countywide Coordinated Communications System (CCCS}. Similar <br />consideration shall be given to any other existing or proposed wireless <br />communications facility that may be located on the subject property. <br />Exhibit A <br />Resolution No. 2009-05 <br />31 A-13 Page 4 of 5 <br />