Laserfiche WebLink
V00 AWP <br />Safe <br />DIR PW REGt 1000001109 <br />CLIENT: EST <br />ESTIMATING DEPARTMENT <br />ITEM # DESCRIPTION <br />TRAFFIC CONTROL SERVICES <br />Proposal/Quote <br />AWP Safety - Santa Aria <br />License # 975518 <br />2722 South Fairview Street <br />Santa Ana, CA 92704 <br />Ph (714) 468-1919 <br />Fax 1562) 272-6857 <br />SPECIFICATIONS: <br />1 TECH, 1 TC TRUCK, 1 FLASHING ARROW BOARD <br />-Includes TC equipment for (1) lane closure <br />1 TC TECH <br />1 TC TRUCK <br />-See attached rate sheet for equipment rental rates. <br />OVERTIME <br />DOUBLETIME <br />SATURDAY closures <br />SUNDAY / HOLIDAY closures <br />Exhibit C <br />BID DATE: 0 1 /09/25 <br />CONTRACT INFO <br />ON -CALL TRAFFIC CONTROL <br />EXTENSION - RFP 21-120 SANTA A <br />PROPOSAL:136262 <br />ESTIMATOR <br />Kevin Hansen <br />PROJECT: <br />ON -CALL TRAFFIC CONTROL <br />SERVICES RFP NO. 21-120 <br />SANTA ANA, CA <br />QUANTITY PRICE AMOUNT <br />+++ 4-HOUR MINIMUM SHIFT CHARGE PER MOBILIZATION +++ <br />+++ 8-HOUR MINIMUM CHARGE 4 - 8 HOUR SHIFT +++ <br />+++ ALL RATES LISTED ABOVE ARE PREVAILING WAGE +++ <br />+++ ALL RATES LISTED ABOVE ARE PORTAL-TO-PORTAL +++ <br />$160.00/HR <br />$115.00/H R <br />$30.00/H R <br />$150.00/8-12 HRS/TECH <br />$180.00/HR over 12 HR/TECH <br />$195.00/HR/TECH <br />$235.00/H R/TEC H <br />- For more extensive closures or for a more detailed breakdown of rates, additional pricing or quotes can be made available <br />upon request on a case -by -case basis. <br />- Each Traffic Tech must be provided a 30 minute meal period. Missed meal periods will be billed at $70.00 per Traffic Tech. <br />NO RETENTION HELD FOR TRAFFIC CONTROL. <br />TRAFFIC CONTROL PLAN <br />SPECIFICATIONS: <br />WITH ENGINEER STAMP $900.00/PER PAGE <br />WITHOUT ENGINEER STAMP $500.00/PER PAGE <br />DOES NOT INCLUDE TEMPORARY STRIPING OR K-RAIL <br />PROPOSAL PROVISIONS - TC <br />SPECIFICATIONS: <br />- A signed contract and 15 working days notice must be given prior to any move in. This quote shall remain valid for 30 days <br />from date of actual bid opening, unless otherwise agreed upon. PAYMENT TERMS ARE- 100%, NET 30 unless otherwise <br />agreed upon. <br />- Unless stated otherwise, all permits and associated fees are excluded from Statewide Traffic Safety and Signs, Inc. dba AWP <br />SAFETY's pricing. <br />- Lump sum items are based on "working days" listed in the Special Provisions or working days bid for this project. Additional <br />compensation (standard rental rates) will be applied if working days are exceeded. <br />- Standards for 5 day work shift must be established IN WRITING prior to Statewide Traffic Safety and Signs, Inc. starting work. <br />- Rental equipment furnished and installed by Statewide Traffic Safety and Signs, Inc. dba AWP SAFETY may not be moved by <br />