Laserfiche WebLink
landscape plan shall include a diverse selection of shade -producing canopy trees <br />from the City's approved street tree list, ensuring the maximum possible number is <br />incorporated. <br />6. The following parking management practices shall be incorporated into the final, <br />recorded CC&Rs and shall apply through the life of the project: <br />a. Requiring onsite parking permits (such as stickers or hang -tags) for any parking <br />in the surface guest parking spaces; <br />b. Policies for maximum time vehicles maybe parked in the surface guest spaces; <br />c. Policies for towing unauthorized vehicles; vehicles parked in unauthorized <br />locations, such as fire lanes; vehicles parking in surface guest parking without <br />a sticker, hang -tag, or other identifiers; and vehicles parked longer than any <br />maximum guest parking timeframes allowed; and <br />d. Routine garage inspections to ensure garages are available for vehicle parking. <br />7. The final map must be approved and recorded prior to issuance of a certificate of <br />occupancy or final sign -offs of building permits for the townhome buildings, <br />whichever is first. <br />8. The final map and all improvements required to be made or installed by the <br />subdivider must be in accordance with the design standards and specifications of <br />the Santa Ana Municipal Code and requirements of the State Subdivision Map Act. <br />9. Two copies of the recorded final map and CC&Rs shall be submitted each to the <br />Planning Division, Fire Authority, Building Division, and Public Works Agency within <br />10 days of recordation. <br />10. Property Maintenance Agreement. Subject to review and applicability by the <br />Planning and Building Agency, the Community Development Agency, the Public <br />Works Agency, and the City Attorney to ensure that the property and all <br />improvements located thereupon are properly maintained, Applicant (and the <br />owner of the property upon which the authorized use and/or authorized <br />improvements are located if different from the Applicant) shall execute a <br />maintenance agreement or incorporate the form of this condition within the Project's <br />CC&R's with the City of Santa Ana which shall be recorded against the property <br />and which shall be in a form reasonably satisfactory to the City Attorney. The <br />maintenance agreement shall contain covenants, conditions and restrictions <br />relating to the following: <br />a. Compliance with operational conditions applicable during any period(s) of <br />construction or major repair (e.g., proper screening and securing of the <br />construction site; implementation of proper erosion control, dust control and <br />noise mitigation measure; adherence to approved project phasing etc.); <br />Resolution No. 2024-XXX <br />Page 10 of 11 <br />