My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - 2024 General Plan Annual Progress Report
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
05/06/2025
>
Item 07 - 2024 General Plan Annual Progress Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 3:12:51 PM
Creation date
5/1/2025 2:41:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
7
Date
5/6/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br />ELEMENT <br />EJ <br />IMPLEMENTATION ACTION <br />AGENCY <br />TIME FRAME <br />2024 UPDATE <br />stormwater channels to underground <br />conduits and activating the space <br />above them. The study is anticipated to <br />be finalized in February 2025. <br />Urban Design <br />No <br />Allowable uses. Expand the types <br />PBA <br />2022 - 2027 <br />The City's Development Review <br />4.3 <br />of outdoor uses in public spaces to <br />Committee continues to seek <br />allow for additional social <br />opportunities for programmable open <br />activities and community -focused <br />space that is accessible to the public in <br />entertainment. <br />all new residential and mixed -use <br />developments. <br />Urban Design <br />No <br />Emerging technologies. <br />PRCSA / <br />2024 <br />The City continues to incorporate EV <br />4.5 <br />Collaborate with wireless and <br />PWA <br />Charging Stations in public parking lots. <br />technology companies to create <br />The new Memorial Park Aquatics <br />wireless charging areas in public <br />Facility will be the first southern <br />spaces. Evaluate the feasibility of <br />California aquatics facility to be solar <br />installing solar -powered charging <br />powered utilizing solar arrays <br />stations. Evaluate the feasibility of <br />incorporated within the design of the <br />providing free public WiFi in select <br />new facility and linked to technology <br />park areas and public plazas. In <br />that converts solar power into energy <br />the parks master plan include <br />that powers both the facility and pool <br />consideration for adapting public <br />once delivered in September 2026. <br />spaces to respond to changes in <br />the way residents live and interact <br />with their environment as a result <br />of emerging technologies. <br />Urban Design <br />No <br />Public art at focus intersections. <br />CDA <br />2023 <br />Arts and Culture staff have released a <br />5.2 <br />Explore a collaborative program <br />request for projects to provide funding <br />with schools, nonprofit <br />for mural restoration. <br />organizations, and local artists to <br />create and maintain public art in <br />public spaces. <br />Urban Design <br />No <br />Placemaking elements at focus <br />PWA / PBA <br />2022 - 2027 <br />PWA and PBA are working with the <br />5.3 <br />intersections. Coordinate street <br />selected firm Torti Gallas and Partners <br />84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.