My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - IMPROVEMENTS AT CABRILLO TENNIS CENTER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
04/06/2009
>
25C - IMPROVEMENTS AT CABRILLO TENNIS CENTER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:21:50 PM
Creation date
4/1/2009 2:14:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
4/6/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REIMBURSEMENT AGREEMENT FOR REPAIR, MAINTENANCE AND <br />IMPROVEMENTS TO THE TWIST BASLER HOUSE <br />This Reimbursement Agreement is made and entered into this day of <br />2009, by and between the City of Santa Ana, a charter city and Municipal <br />Corporation organized under the Constitution and laws of the State of California ("City") <br />and Southwest Property Investment, Inc. (hereinafter referred to as "Southwest") located <br />at 1103 North Broadway, Santa Ana, California 92701. <br />Recitals: <br />A. In 2004, the City of Santa Ana entered into a development agreement with One <br />Broadway Plaza, LLC which, among other things, called for relocation of the <br />Historic Twist Basler House formerly located at 1015 North Broadway to its <br />current location at 800 North Cabrillo Park Drive within the Cabrillo Tennis <br />Center. <br />B. The Twist Basler House reconstruction is nearing completion but additional <br />unforeseen repair, maintenance, and improvements are needed in and around the <br />House. <br />C. Southwest is willing to complete the repair, maintenance, and improvements on <br />the exterior and interior of the House under this reimbursement agreement. The <br />reconstruction of the exterior of the house called for in this agreement is not part <br />of the original One Broadway Plaza, LLC Development Agreement. <br />D. Continuing the repair, maintenance, and improvements of the house with <br />Southwest through a reimbursement agreement will save the city time and staff <br />work in preparing plans and specifications. <br />NOW, THEREFORE, THE PARTIES MUTUALLY AGREE AS FOLLOWS: <br />I. PROJECT FUNDING, SCOPE AND REVIEW <br />1. For and in consideration of the sum not to exceed One Hundred Fifty Three <br />Thousand, Eight-Hundred and Sixty Seven dollars and 40 cents ($153,867.40), and under <br />the conditions expressed herein, Southwest hereby agrees to and shall do all the work <br />necessary to complete in good workmanship and substantial manner the work described <br />in paragraph 2 of this agreement and in compliance with City of Santa Ana standards and <br />regulations. <br />2. Upon approval of this agreement by the City Council, Southwest will prepare <br />plans and specifications required for obtaining permits and will take all necessary actions <br />to complete the following improvements in connection with the restoration of the Twist <br />Basler House: <br />Page 1 of 5 <br />25C-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.