My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - 55 AND ALTON AVE OVERCROSSING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
04/06/2009
>
25D - 55 AND ALTON AVE OVERCROSSING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:21:53 PM
Creation date
4/1/2009 2:14:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25D
Date
4/6/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISTRICT AGREEMENT <br />12-522 <br />ATTACHMENT 3 <br />DEFINITIONS <br />Basic Design Features - A general description of the facility: <br />• Design speed of State Highway facility and Local Agency roads and streets. 120 km/h and 75 <br />km/h <br />• Number of through lanes, auxiliary lanes and locations of interchanges and separations. 4 <br />through lanes each direction, one auxiliary lane each direction, one through HOV lane each <br />direction, 0.8 km to MacArthur Boulevard, 0.6 km to Dyer Road, 2.4 km to 55!405 interchange <br />• Widths of through lanes, medians, and shoulders for both the State Highway facility and local <br />roads and streets. FREEWAY: Lanes are 3.6 meters, median varies >5.4 meters, right shoulders <br />are 3.0 meters, left shoulders vary from 0.6 meters to >3.0 meters; STREET: lanes vary 3.6 to <br />4.9 meters, median varies 3.6 to 4.9 meters <br />• Need for special feature such as sound walls, transportation system management plans, HOV <br />lanes, bridge widening, ramp metering, etc. See Figure 2-1.3A of State Project Development <br />Procedures Manual for additional discussion of items to be considered as basic design features. <br />Existing HOV lanes would be maintained, new HOV drop ramps would be implemented, Dyer <br />Road under crossing would be widened, Alton Avenue over crossing would be constructed, ramp <br />meters would be included on all four affected on-ramps <br />Mandatory and Advisory Design Standards have been approved on 10/02/2001 and 8/23/2001 <br />respectively. <br />25D-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.