My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - 6 E MACARTHUR PLACE - NEXUS DEVELOP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/04/2009
>
75B - PH - 6 E MACARTHUR PLACE - NEXUS DEVELOP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:21:26 PM
Creation date
4/29/2009 12:57:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
5/4/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. Prior to issuance of Certificate of Occupancy Permits, the required landscaping for <br />each building component of the project shall be installed to the satisfaction of the City <br />of Santa Ana Planning Department. <br />15. Prior to the issuance of a building permit, the project developer shall provide <br />evidence to the Planning Manager that an FAA "No Hazard" determination has been <br />secured. The project developer shall demonstrate compliance with any conditions <br />imposed by the FAA. <br />16. During construction, the contractor shall be required to comply with SCAQMD <br />Fugitive Dust Rule 403 to suppress dust generated by construction operations. To <br />ensure compliance with SCAQMD Fugitive Dust Rule 403, grading plans and <br />demolition plans for the proposed project shall reflect the following notes: <br />• All materials excavated or graded shall be sufficiently watered to prevent excessive <br />amounts of dust. Watering with complete coverage shall occur at least twice daily, <br />once in the late morning and once after work is done for the day. <br />• All clearing and earthwork activities shall cease during periods of high winds (winds <br />greater than 25 mph averaged over one hour) or during Stage 1 or Stage 2 smog <br />episodes. <br />• Internal roadways and project site entry and exit points shall be cleaned at the end <br />of each day by the project developer. Dust and debris from construction activities <br />that migrates or is carried onto MacArthur Boulevard or Main Street adjacent to the <br />project site shall also be cleaned each day. <br />• All material transported off-site shall either be sufficiently watered or securely <br />covered to prevent excessive amounts of dust. Haul trucks leaving the site shall <br />have a minimum freeboard distance of 12 inches. <br />• Construction equipment leaving the project site shall be wheel washed. <br />• The amount of area disturbed by clearing and earthwork activities shall be <br />minimized at all times. <br />• Equipment engines shall be maintained in good condition and in proper tune <br />according manufacturer's specifications. <br />• To the extent feasible, construction equipment shall use alternative clean fuels <br />such as compressed natural gas equipment with oxidation catalysts. If alternative <br />Resolution No. 2009- <br />Page 10 of 30 <br />75B-122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.