My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - 6 E MACARTHUR PLACE - NEXUS DEVELOP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/04/2009
>
75B - PH - 6 E MACARTHUR PLACE - NEXUS DEVELOP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:21:26 PM
Creation date
4/29/2009 12:57:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
5/4/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
saving measures beyond Title 24 requirements and encouraging the use of Energy <br />Star equipment and appliances. <br />73. Prior to the issuance of a building permit, the project developer shall provide <br />evidence to the Planning Manager that the FAA Determination of No Hazard to Air <br />Navigation has been obtained for the relocated Cinema Tower. The project <br />developer shall demonstrate compliance with any conditions imposed by the FAA in <br />their determination. <br />74. During operation of the hotel, the project developer shall ensure that truck deliveries <br />to the hotel shall be restricted to the hours of 7:00 a.m. to 10:00 p.m. Delivery trucks <br />shall not be permitted to idle in the parking lots or loading areas and shall be required <br />to have properly maintained, factory-approved mufflers. Delivery truck drivers shall <br />be encouraged to minimize acceleration and maintain reduced vehicle speeds while <br />on-site. <br />75. During project construction for the hotel, the project contractor shall verify that <br />structural designs and acoustical baffling are implemented to reduce noise levels <br />form mechanical equipment (ventilation fans, air conditioning and refrigeration units <br />and their associated inlet and exhaust systems) to a level that complies with the <br />City's Municipal Code noise ordinance standards. <br />76. Prior to issuance of building permits, the project developer shall ensure that the <br />building plans for the hotel shall incorporate facilities for collection and pick-up of <br />recyclable materials. <br />B. Police Department <br />A security plan must be submitted to the Police Department at the plan check stage <br />for approval. The plan must cover all aspects of the projects security including <br />security personnel, surveillance equipment, and hardware. The project will be <br />required to have a minimum of four state licensed uniformed security personnel. One <br />security officer will be required for each building, one for the podium level and one for <br />the parking garage. <br />2. All project walkways shall be illuminated to a minimum maintained one footcandle of <br />light. <br />3. Existing surface parking lot must conform to the provisions of Chapter 8, Article II <br />Division 3 of the Santa Ana Municipal Code (Building Security Ordinance). These <br />code conditions will require that the existing project's lighting be upgraded to current <br />Resolution No. 2009- <br />Page 18 of 30 <br />75B-130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.