Laserfiche WebLink
Responses to <br />Environmental Checklist <br />For CEQA Compliance <br />construction, repair, remodeling, or grading of any real property, but establishes certain requirements to <br />reduce the temporary impacts of construction noise. These include limiting the construction activity, <br />including all warming up and repair of construction equipment within the project site so that they do not <br />take place between the hours of 8:00 p.m. and 7:00 a.m. on weekdays, including Saturday, or any time <br />on Sunday or a federal holiday. To further reduce potential noise impacts on adjacent residences, the <br />following project requirements and mitigation measures shall be implemented as part of the proposed <br />project: <br />MM NOI-1 The Applicant shall require by contract specifications that the following construction best <br />management practices (BMPs) be implemented by contractors to reduce construction <br />noise levels: <br />^ Notification shall be mailed to owners and occupants of all developed land uses <br />immediately bordering or directly across the street from the project site area <br />providing a schedule for major construction activities that will occur through the <br />duration of the construction period. In addition, the notification will include the <br />identification and contact number for a community liaison and designated <br />construction manager that would be available on site to monitor construction <br />activities. The construction manager will be located at the on-site construction <br />office during construction hours for the duration of all construction activities. <br />Contract information for the community liaison and construction manager will be <br />located at the construction office, City Hall, and the police department. <br />^ Ensure that construction equipment is properly muffled according to industry <br />standards. <br />^ Place noise-generating construction equipment and locate construction staging <br />areas away from the adjacent residential uses. <br />^ Implement noise attenuation measures to the extent feasible, which may include, <br />but are not limited to, noise barriers or noise blankets. <br />MM NOI-2 The Applicant shall require by contract specifications that construction staging areas, <br />along with the operation of earthmoving equipment within the project site, are located as <br />far away from vibration- and noise-sensitive sites as possible. Contract specifications <br />shall be included in the proposed project construction documents, which shall be <br />reviewed and approved by the City. <br />MM NOI-3 The Applicant shall require by contract specification that construction activities generating <br />the loudest noise levels (e.g. site grading) shall not occur prior to 9:00 A.M. or after <br />5:00 P.nn. Monday through Friday. Further, such activities shall be prohibited on <br />Saturdays, Sundays and federal holidays. <br />MM NOI-4 The Applicant shall require by contract specifications that no delivery of materials or <br />maintenance of equipment shall occur at the project site after 6:00 F.M. on weekdays and <br />Saturdays, before 7:00 A.M. on weekdays and Saturdays, and at no time on Sundays. <br />Pursuant to mitigation measure MM NOI-1, the implementation of noise attenuation measures may <br />include the use of noise barriers (e.g., sound walls) or noise blankets. As a general rule, a sound wall is <br />able to reduce noise by 5 dBA. In addition, mitigation measure MM NOI-2 requires location of <br />construction staging areas and earthmoving equipment as far away from noise and vibration-sensitive <br />land uses as possible to reduce construction-related noise levels. Additionally, implementation of <br />MM NOI-3 would require that the construction contractor limit the loudest construction activities to occur <br />75A-51 <br />