Laserfiche WebLink
TABLE 3 <br />PROPOSED PROJECT TRIP GENERATION SUMMARY' <br /> PEAK HOUR <br /> ITE AM PM <br />LAND USE Code UANTI UNITSZ IN OUT TOTAL IN OUT TOTAL DAILY <br />Condominium Pro ect 5 sto 223 276 DU 25 58 83 63 44 107 1,292 <br />Lake Towers Hi h-rise A artments 222 349 DU 28 77 105 73 49 122 1,466 <br />Cinema Tower Condominiums 232 150 DU 9 42 51 36 21 57 627 <br />Business Hotel 312 185 OCCUPIED ROOM 63 44 107 68 46 114 1,345 <br />Future Use Traffic Total 125 221 346 240 160 400 4,730 <br />Internal Ca lure 5% 6 11 17 12 8 20 237 <br />Future Use External Traffic Total 119 210 329 228 152 380 4,493 <br />Existin Uses Demolished <br />Theater 20% utilization of 40 TSF s 443 8.0 TSF 0 0 0 46 3 49 624 <br />Restaurant (Sports Grill) 932 12.0 TSF 0 0 0 79 55 134 1,526 <br />Existing Traffic Total 0 0 0 125 58 183 2,150 <br />Pro osed Project Net New Traffic Total Future External -Existing) 119 210 329 103 94 197 2,343 <br />Current) roved Project Net New Traffic Total 123 289 412 169 133 302 3,101 <br />DIFFERENCE Pro osed - roved) -4 -79 -83 -88 -39 -105 -758 <br />' Source: ITE (Institute of Transportation Engineers] Trip Generation Manual, 8th Edition, 2008. <br />DU =Dwelling Units, TSF =Thousand Square Feet <br />s Theatre utilization of 20% full occupancy at the time traffic counts were conducted. <br />° Sports Grill assumed to generate no AM peak hour traffic. <br />U:1Uc.lobs\_08600-07000106800\088741Excell[06874-04.xlsjT 3 <br />75B-105 <br />