Laserfiche WebLink
Introduction <br />A. Executive Summary <br />The Final Environmental Impact Report ("EIR") for the MacArthur Place South project was certified <br />on June 20, 2005. The project is a mixed use development consisting of three 25-story residential <br />towers, three low rise condominium buildings, asix-story residential/office building with 10,000 <br />square feet of office and 15 residential loft units, and asingle-story 13,871 square-foot retail building <br />consisting of 8,580 square feet of restaurant and 5,290 square feet of retail. The project site is located <br />at the southeast corner of MacArthur Boulevard and Main Street in southeast Santa Ana. East of the <br />site is the Costa Mesa Freeway (SR-55), south and east of the site is the City of Irvine and the City of <br />Costa Mesa is located to the southwest. John Wayne Airport is approximately 1.1 miles south of the <br />project site. <br />This document constitutes the Addendum to the Final EIR for the Mac Arthur Place South project, <br />SCH #2004061140, as certified by the City of Santa Ana. The Addendum reviews the environmental <br />impacts identified in the EIR in relation to changes to the project since the EIR was certified. These <br />include the elimination of the Cinema Lofts (comprised of 15 residential units and 10,000 square feet <br />of office use), removal of 13,871 square feet of retail/restaurant uses, the addition of a 185 room <br />hotel, moving the Cinema Tower south of its approved location and the eventual construction of a <br />parking structure for joint use by the hotel and Cinema Tower. An Initial Study Checklist, pursuant <br />to CEQA, is included herein. The Initial Study and the Addendum fully comply with all relevant <br />California Environmental Quality Act (CEQA) standards to determine if the EIR remains adequate to <br />address the impacts resulting from the project pursuant to CEQA Guidelines § 15164. <br />B. Environmental Impact Report Addendum <br />Pursuant to §15367 of the CEQA Guidelines, the City of Santa Ana is the Lead Agency for this <br />project. As defined, the lead agency has the principal responsibility for carrying out or approving a <br />project. This Addendum updates the progress made in the project, as certified, and serves to update <br />the information in the EIR as contemplated in CEQA Guidelines § 15164. This document will also be <br />used to acknowledge the addition of mitigation measures and further project modifications to the site. <br />The CEQA Guidelines (California Code of Regulations § 15000, et seq.) authorize the use of an <br />Addendum for the purpose of making minor or technical changes, as long as these changes do not <br />rise to the level of requiring a subsequent or supplemental EIR pursuant to CEQA Guidelines <br />§ 15162. CEQA Guidelines § 15164 states: <br />a) The lead agency or a responsible agency shall prepare an addendum to a previously <br />certified EIR if some changes or additions are necessary but none of the conditions <br />described in Section 15162 calling for preparation of a subsequent EIR have <br />occurred. <br />C. Statutory Requirements <br />Section 21166 of the California Environmental Quality Act (CEQA, Public Resources Code §21000, <br />et seq.) sets the standard to determine whether another EIR should be prepared when an original EIR <br />has been prepared. Section 21166 states: <br />MacArthur Place South D ~,~~~t, <br />EIR Addendum o ~CC <br />75B-47 <br />